Forum quick links
LEED Online Forms
NC-2009 MRc2:Construction Waste Managementposted by Robyn Reichert-Cook on
It wants me to select one of the "additional details" but neither seem correct. What is considered "standard submittal" process?
Level playing field for Recycled Content
NC-2009 MRc4:Recycled Contentposted by barbara anderson on
Can someone please tell me how a LEED specification specialist establishes the recycled content requirement?
Use of existing facilities - Cement Distribution Plant, Colombia
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Edgar Rodriguez on
We are working in Colombia on a new 4,840sqft "dinning room facility" that will serve all users 24/7 of already existing administrative offices and truck drivers (this existing facilities are not c
Industrial Facility Large Space - Occupied?
posted by Aaron Luthien on
Hi, Our project is an industrial building with a large bottle filling facility. That bottle filling machine is situated in a large space (approx. 100,000 sf and 10 meters high).
Calculation for recycling storage area
Healthcare-v2009 MRp1:Storage and collection of recyclablesposted by yanghee pierce on
Hello, How does a project determine the minimum space (sf) required by LEED HC for recycling storage areas? How does a project determine the projected waste volume? Thanks!
LEED Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Bernard Sagaiyaraj on
My project is an office tower located on a plot of land housing 5 other buildings. All hardscape and landscape on the ground outside these buildings are not within the scope of work of my project.
Showers not dedicated to CI project only
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Mike D on
The project consists of one floor of offices located within a building of 12 floors.
Engineering vs Commissioning
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Matthew VanSweden on
For projects under 50,000 sf, can the HVAC engineer and commissioning agent be the same person? Obviously not best practice but strictly speaking, is this allowable?
Ceramic Tiles only
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Habitech Distretto Tecnologico Trentino on
Hi! We are working on a LEED CS v2009 where only ceramic tiles (flooring+wall base) will be installed as part of the CS scope of works.
rainwater for greenhouse food production
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Karl Heitman on
We are designing an 150,000 sf industrial production facility in Chicago with a greenhouse on the roof for food production.