Microclimate conditions versus Climate zones by ASHRAENC-2009 EAp2: Minimum Energy Performanceposted by Esteban Undurraga on Jul 23, 2012, 5:57 pmweather database should do the job. Will maintain the forum updated on the success (or not) of this matter. Log in or register to post comments ... Last reply: Esteban Undurraga, Jul 25, 2012, 4:42 pm |
|
MERV13s on VAV boxesCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Michelle Rosenberger on Jul 24, 2012, 7:11 pm
We continue to struggle with the issue of whether... Last reply: Dylan Connelly, Jul 25, 2012, 11:58 am |
|
suggestionsGeneral forumsposted by Bill Swanson on Jul 25, 2012, 8:52 amthey shouldn't. LEEDuser is open forum were we can express out first amendment protected opinions. Some people may think LEEDuser is controlled by the USGBC/ GBCI but it is an independent news group. Peter... Last reply: Tristan Roberts, Jul 27, 2012, 12:41 pm |
|
Annual Energy Cost EscalationSchools-2009 EAc2: On-Site Renewable Energyposted by Michael Trzcinski on Aug 7, 2012, 11:51 am
If a project includes a 3rd party PV system, and the electric rate increases each year after the 1st year (under the PPA), what rate must we use in calculating the dollar savings? Last reply: Marcus Sheffer, Aug 7, 2012, 3:28 pm |
|
High Trans. Building- No fixtures for Trans. OccupantsNC-2009 WEp1: Water Use Reductionposted by James Del Monaco on Aug 9, 2012, 2:41 pm
I have a 7,000 SF Physical Education Building which has a majority of the space decicated to PE type activities such as dancing, weightlifting, etc. Otherwise there are two small office spaces... Last reply: Carlie Bullock-Jones, Sep 11, 2012, 9:22 pm |
|
Modeling a Natural Ventilation BuildingNC-2009 EAc1: Optimize Energy Performanceposted by Carolina Vergnano on Aug 13, 2012, 10:35 am
Hi, I'm working in a project that has 4 conditioned office rooms, which are enclosed by walls, and a café (adjacent to the office) that is natural ventilated. Last reply: Marcus Sheffer, Aug 23, 2012, 2:46 pm |
|
ENERGY COST BUDGET METHOD, ENVELOPECI-2009 EAp2: Minimum Energy Performanceposted by TOMAS URIBE on Aug 14, 2012, 11:24 am
Greetings. Last reply: Marcus Sheffer, Oct 19, 2012, 3:48 pm |
|
WWR calculation- green wall- latticeCS-2009 EAp2: Minimum Energy Performanceposted by Ron Dean on Aug 15, 2012, 6:51 pm
Hi all! I’m modeling a 49-story building with 7 basements, and it has over 40 % (about 85 %) of its envelope covered with glazing, so I have a doubt about the calculation on the Window to... Last reply: Marcus Sheffer, Jan 8, 2013, 3:42 pm |
|
COC Certification Required for GC...?NC-2009 MRc7: Certified Woodposted by Adrienne Lynn on Aug 16, 2012, 5:29 pm
We are a General Contractor and we are wondering if we, ourselves, would be required to get COC Certified when attempting to achieve MRc7? We purchase... Last reply: Michelle Rosenberger, Oct 29, 2012, 1:53 pm |
|
Air recirculation and outdoor airNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Aug 17, 2012, 8:02 am
I have some doubts concerning air loops of the baseline model, system 5 (Packaged... Last reply: Marcus Sheffer, Aug 17, 2012, 2:42 pm |