Forum quick links
Campus PV PPA
NC-2009 EAc2:On-Site Renewable Energyposted by Chad Coleman on
I am hoping that someone can shed some light on the way a Campus PV PPA will be viewed for EAc1 and EAc2 in LEED NCv2009.
ASHRAE 90.1-2007 - Section 8.4 - Voltage drop
NC-2009 EAp2:Minimum Energy Performanceposted by Ali Helmy on
We are working on the LEED certification for a hospital building with 10 floors height.
Default fixture usage - showers in a swimming pool facility
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ricardo Sá on
In a swimming pool facility it is very likely that almost all users do take a shower before leave.
IEQc8.2 Exemplary Performance
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Ron Dean on
Hi: About the Measure 1: "90% or more of regularly occupied spaces have multiple lines of sight, to vision glazing, in different directions at least 90 degrees apart"...
TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS
NC-2009 MRc4:Recycled Contentposted by anupam verma on
Currently I am working on a project registered under v2.3. My question is related with TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS in MR credit 4 & 5.
EAc5 Measurement and Verification Option 3
NC-2009 EAc5:Measurement and Verificationposted by Dan Milewski on
Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form. Is option 3 available as a stand alone option or only as a exemplary performance if Options 1
Private versus public lavs
Healthcare-v2009 WEc3:Water use reductionposted by Kim Shinn on
In an in-suite setting (imaging, lab, urgent care or even emergency department), we frequently see situations where there are restrooms provided for patient (and staff) use embedded in the diagnost
Calculating Concrete
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Catherine Blakemore on
How does concrete get logged on the MRc3 Calculator? Should each component be listed with individual costs for each?
Plan development
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Michael E. Edmonds-Bauer on
For this purpose we would like to know if: - In order to comply with requirements, can we develop a plan similar to the one use for the core & base building (calibrated simulation)?
Alternative Compliance Path for SRI compliant products
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Maya Karkour on
Dear All, I received an email from LEEDUser called "LEED Updates: New Interpretations & Addenda" One interesting point was the following: "USGBC introduces multiple new options for non-U.S.