Topic | Recent |
---|---|
Projects in Europe may use the values defined by EU standards?CI-2009 WEp1: Water Use Reductionposted by Michael Smithing on Aug 24, 2016, 4:42 am
Does anyone have any idea what these standards are or where they can be found? The European water label gives its highest rating (Green) to WC taps with a flow of 6 liter/minute or less. As the... |
|
Calculator Points clarificationPilot-Credits MRpc102: Legal Woodposted by Francis McNulty on Aug 26, 2016, 8:07 am
Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2. ... |
|
How to simulate qualified area for IEQc8.1 at both 9 am and 3pmCS-2009 IEQc8.1: Daylight and views - daylightposted by Cathy W on Aug 26, 2016, 8:12 am
Our project chose option 1 -simulation. And the simulation result is 84% ROA is qualified at 9 am, 83% ROA is qualified at 3pm. Then I took 83% as a simulation result. |
|
Faucet Flowrate at Actual Water Supply PressureCI-2009 WEp1: Water Use Reductionposted by Ran Zhang on Aug 30, 2016, 3:48 am
Hi all, |
|
Compliance for Existing Site FeaturesPilot-Credits PC14: Walkable Streetsposted by Vicki Rybl on Sep 6, 2016, 2:32 pm
I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit. 7. There are no sidewalks... |
|
Use of existing on site treePilot-Credits MRpc102: Legal Woodposted by Dustin Davis on Sep 8, 2016, 3:43 pm
We have a project that we are thinking about applying the new legal... |
|
Structure and EnclosureNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Jon Clifford on Sep 10, 2016, 10:09 am
A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat... |
|
Reviewer's comment on MPR2NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Eric Bautista on Sep 14, 2016, 12:11 am
I am handling a new LEED building addition horizontally attached to a non-LEED existing building. We have submitted for Preliminary review and here are the comments from the reviewer (I put... |
|
supplier and products UFNC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Jose Antonio Kovacevic on Sep 20, 2016, 4:37 pm
To comply with IEQc4.4 credit in LEED NC |
|
Self adhesive carpetNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Omar Elrawy on Sep 27, 2016, 7:32 am
We are using... |