Log in
Forum
Topic

Projects in Europe may use the values defined by EU standards?

CI-2009 WEp1: Water Use Reduction
posted by Michael Smithing on Aug 24, 2016, 4:42 am

Does anyone have any idea what these standards are or where they can be found? The European water label gives its highest rating (Green) to WC taps with a flow of 6 liter/minute or less. As the...

Calculator Points clarification

Pilot-Credits MRpc102: Legal Wood
posted by Francis McNulty on Aug 26, 2016, 8:07 am

Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.

...

How to simulate qualified area for IEQc8.1 at both 9 am and 3pm

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Cathy W on Aug 26, 2016, 8:12 am

Our project chose option 1 -simulation. And the simulation result is 84% ROA is qualified at 9 am, 83% ROA is qualified at 3pm. Then I took 83% as a simulation result.
But I got project...

Faucet Flowrate at Actual Water Supply Pressure

CI-2009 WEp1: Water Use Reduction
posted by Ran Zhang on Aug 30, 2016, 3:48 am

Hi all,
I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure. There have been a few discussions on...

Compliance for Existing Site Features

Pilot-Credits PC14: Walkable Streets
posted by Vicki Rybl on Sep 6, 2016, 2:32 pm

I am working on a project where most of the site hardscape is existing. I'm looking for an opinion specifically on two of the requirements for this credit.

7. There are no sidewalks...

Use of existing on site tree

Pilot-Credits MRpc102: Legal Wood
posted by Dustin Davis on Sep 8, 2016, 3:43 pm

We have a project that we are thinking about applying the new legal...

Structure and Enclosure

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Jon Clifford on Sep 10, 2016, 10:09 am

A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat...

Reviewer's comment on MPR2

NC-2009 MPR2: Must be a complete, permanent building or space
posted by Eric Bautista on Sep 14, 2016, 12:11 am

I am handling a new LEED building addition horizontally attached to a non-LEED existing building. We have submitted for Preliminary review and here are the comments from the reviewer (I put...

supplier and products UF

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Jose Antonio Kovacevic on Sep 20, 2016, 4:37 pm

To comply with IEQc4.4 credit in LEED NC
It has been evaluated local furniture suppliers of...

Self adhesive carpet

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Omar Elrawy on Sep 27, 2016, 7:32 am

We are using...