Topic | Recent |
---|---|
new ACP featuring Dynamic PlaqueGeneral forumsposted by Tristan Roberts on May 24, 2016, 2:12 pm
As we reported on BuildingGreen.com (see EBOM certification. From the article: |
|
Required parking lots and LEED boundary CalculationsHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by kerry wang on May 24, 2016, 11:15 pm
Hi all, In order to save the land, our company has set up a shared parking lot in the area, so this project does not have... |
|
LEEDv4- College Building Which Rating?LEED Rating System Selectionposted by ankur khandelwal on May 25, 2016, 3:39 am
We have a project in Texas which is having two Academic buildings (not connected) in a College, both of 4 floors having Lecture Theaters and Library. Will this be resisted in LEEDv4 BD+C: New... |
|
Required parking lots and LEED boundary CalculationsCS-2009 MPR3: Must use a reasonable site boundaryposted by kerry wang on May 25, 2016, 10:37 pm
Hi all, In order to save the land, our company has set up a shared parking lot in the area, so this project does not... |
|
testing by ISO 16000Retail-CI-v2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Nativa Architecture on May 26, 2016, 9:59 am
Shall we use a vinyl flooring tested by ISO 16000? It has... |
|
Major renovation for NC and C&SLEED Rating System Selectionposted by OSCAR DE LA RED on May 30, 2016, 3:13 pm
If there is not an exterior Work on envelope but there is a core MEP alteration ,could a project be certified as a NC LEED Project (or C&S)? According to the rating system selection guidance... |
|
WEp1 calculatorNC-2009 WEp1: Water Use Reductionposted by Muriel Alvarez on Jun 1, 2016, 4:00 pm
Dear |
|
Metered Lav Faucets No MoreCI-v4 WEp1: Indoor water use reductionposted by Michelle Rosenberger on Jun 1, 2016, 4:23 pm
I posted this comment on the NC forum in addition to here because there haven't been any responses to questions posed on this forum. I addressed it to the LEEDuser expert on that forum. ... |
|
Campus and groupLEED Guidance for Campuses and Multiple Buildingsposted by Charalampos Giannikopoulos on Jun 2, 2016, 7:58 am
There are seven existing buildings on a site, all owned (the site and the buildings) by the same entity who leases the buildings to tenants. Only one of those buildings is empty and thus cannot... |
|
Credit Still Open?Pilot-Credits PC12: Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on Jun 9, 2016, 8:28 am
Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? |