square feet documented varies from total area in Pif3

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Charline SEYTIER  on 

Did anyone had ever to explain to the reviewers discrepancy between the area documented in IEQp1 and the total area in PIf3? We had 33% of the total area that were NOT documented in IEQp1.

3
CEO, Co-owner.
ThemaVerde, France
LEEDuser Basic Member
15 thumbs up
Fri Feb 28, 2014, 1:42 pm

Elevator shafts - included in GFA? Please, help!

NC-2009 PIf3:Occupant and Usage Data
posted by  Diana Nezamutinova  on 

Dear All, Are elevator shafts included in the calculations of GFA?

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Feb 28, 2014, 1:03 pm

Water cooled chillers for very dry areas

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Thu Feb 27, 2014, 5:22 pm

Service Hot Water

CS-2009 EAp2:Minimum Energy Performance
posted by  Anna Korinkova  on 

Dear fellow LEEDusers. Our base building (C&S) has not included a service hot-water system (it will be installed by tenants later) and therefore we modelled the Proposed Building Performance an

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Thu Feb 27, 2014, 3:41 pm

Land Trust Approach - Donation of $ vs Donation of Land

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Abena Darden  on 

Hell all - I've been trying to understand the requirements of the SS 5.1 ACP which allows donation of offsite land in trust.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 26, 2014, 8:19 pm

U Value & SHGC

NC-2009 EAp2:Minimum Energy Performance
posted by  SSN Energy Model  on 

Hi, We are in the process of doing Energy Simulation for Garments Factory. We have completed the base case part and proposed case is pending.

4
Wed Feb 26, 2014, 6:46 pm

minimum air flowrates in Baseline Case

NC-2009 EAp2:Minimum Energy Performance
posted by  Charline SEYTIER  on 

Hi, We are in the process of responding to the comments we received from the reviewers on the energy model of one of our project performed with eQuest. The reviewer is asking us to provide an inpu

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Wed Feb 26, 2014, 6:37 pm

Calculation Issue

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Farah A.  on 

A building pursuing the Development Density and Community Connectivity credit is located within a 2 acres community (8,093,m²), in which existing buildings total 90,000 sq. ft (8,361 m²).

3
Default Avatar
LEEDuser Basic Member
7 thumbs up
Wed Feb 26, 2014, 4:37 pm

HVAC baseline system

NC-2009 EAp2:Minimum Energy Performance
posted by  Gabriela Crespo  on 

Dear all, I have a question regarding an HVAC baseline model for systems 7 and 8. We have a project located in a very arid zone, where water is very limited.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Feb 26, 2014, 3:30 pm
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 26, 2014, 3:26 pm