Forum quick links
square feet documented varies from total area in Pif3
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charline SEYTIER on
Did anyone had ever to explain to the reviewers discrepancy between the area documented in IEQp1 and the total area in PIf3? We had 33% of the total area that were NOT documented in IEQp1.
Elevator shafts - included in GFA? Please, help!
NC-2009 PIf3:Occupant and Usage Dataposted by Diana Nezamutinova on
Dear All, Are elevator shafts included in the calculations of GFA?
Water cooled chillers for very dry areas
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.
Service Hot Water
CS-2009 EAp2:Minimum Energy Performanceposted by Anna Korinkova on
Dear fellow LEEDusers. Our base building (C&S) has not included a service hot-water system (it will be installed by tenants later) and therefore we modelled the Proposed Building Performance an
Land Trust Approach - Donation of $ vs Donation of Land
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Abena Darden on
Hell all - I've been trying to understand the requirements of the SS 5.1 ACP which allows donation of offsite land in trust.
U Value & SHGC
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We are in the process of doing Energy Simulation for Garments Factory. We have completed the base case part and proposed case is pending.
minimum air flowrates in Baseline Case
NC-2009 EAp2:Minimum Energy Performanceposted by Charline SEYTIER on
Hi, We are in the process of responding to the comments we received from the reviewers on the energy model of one of our project performed with eQuest. The reviewer is asking us to provide an inpu
Calculation Issue
NC-2009 SSc2:Development Density and Community Connectivityposted by Farah A. on
A building pursuing the Development Density and Community Connectivity credit is located within a 2 acres community (8,093,m²), in which existing buildings total 90,000 sq. ft (8,361 m²).
HVAC baseline system
NC-2009 EAp2:Minimum Energy Performanceposted by Gabriela Crespo on
Dear all, I have a question regarding an HVAC baseline model for systems 7 and 8. We have a project located in a very arid zone, where water is very limited.