PC44- where is the "Pilot Credit Feedback Survey"?

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Leticia SooHoo on Mar 29, 2019, 12:53 am

Our project is pursuing LEED v4 EQ44 -

'Provide the registration confirmation email for the Pilot Credit from USGBC and the email confirming completion of the Pilot Credit Feedback Survey...

Last reply: Kristi Ennis, Apr 23, 2024, 10:35 am

Should Buildable Land Area include Playing Fields for University Campuses?

NC-v4 LTc4: Surrounding density and diverse uses
posted by Ransom Burgess on Apr 4, 2019, 3:03 pm

I am documenting surrounding...

Last reply: Kara Strong, Apr 20, 2020, 8:14 am

CARB or SCAQMD | VOC content

NC-v4 EQc2: Low-emitting materials
posted by Mario S. on Apr 8, 2019, 7:27 am

Hello,

We have products that are rust preventative coatings tested as per US EPA test method which is the testing method for...

Last reply: Ping Chirayucharoensak, Aug 21, 2024, 11:46 pm

Solar Panels

CI-v4 EAc1: Enhanced Commissioning
posted by Alexis Voeltner on Apr 8, 2019, 5:05 pm

Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the...

Last reply: Ronnel Flores, Jul 15, 2020, 11:37 pm

Partial Compliance Requirement for Insulation Category

NC-v4.1 EQc2: Low-emitting materials
posted by Marcia Weekes on Apr 9, 2019, 7:15 am

For the insulation category, the credit language indicates that "At least 75% of all insulation, meets the...

Last reply: Chyanne Husar, May 27, 2020, 7:42 pm

Signage Directly on Entrance Door?

NC-v4 EQp2: Environmental tobacco smoke control
posted by LUCY WILLIAMS on Apr 22, 2019, 10:02 am

Has any team ever had an issue with posting the signage DIRECTLY ON the entrance door in lieu of 10' out on a post?  The credit language says "within 10' of the entrance".  On the door seems...

Last reply: Renee Shirey, Nov 18, 2020, 2:37 pm

LEED Boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Miguel Rivera on May 7, 2019, 9:30 am

Hi,
Our project has two buildings, one to be certified and the other next to the building is a parking garage. We want to know if the parking garage needs to be included in the LEED...

Last reply: Miguel Rivera, May 7, 2019, 2:10 pm

Register a new project under LEED BD+c v4.0 Or LEED BD+c v4.1

LEED v4.1 Discussion Forum
posted by Ahmed El Attar on May 11, 2019, 2:54 am

I am about to register for a new project. I was going to register it under LEED BD+c v4.0 but it seems that v4.1 is also available, so i don't know which to choose, bearing in mind that there is...

Last reply: Dustin Norton, May 15, 2019, 11:24 am

Meeting Option 2 Requirements

CI-v4 EAc3: Advanced Energy Metering
posted by Bonny Gray on May 11, 2019, 5:28 pm

Below are the construction review comments from our reviewer:

Option 2:  Advanced Metering

  1. It is unclear if the Table:  Advanced Meters includes all individual energy end-uses...

Last reply: Marcus Sheffer, Feb 24, 2020, 10:52 am

U.S. Department of Energy’s (CBECS) database- data on the website

CI-v4 EAc6: Green power and carbon offsets
posted by Karen Elliott on May 13, 2019, 4:51 am

Dear All

We used prescriptive option on Minimum Energy Performance, so looking to calculate out energy use via U.S. Department of Energy’s Commercial Buildings Energy Consumption Survey (...