Zero lot line projects with no parking provided

NC-v4 LTc8: Green vehicles
posted by Summer Gorder on Feb 13, 2019, 12:10 pm

What are options for zero lot projects with no parking provided in an urban context? Also, the project is a Health Department HQ, but does have truck loading. Can the warehouse option for Reduced...

Last reply: Dave Hubka, Mar 16, 2020, 2:38 pm

Exclusion of supporting buildings from LEED boundary?

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Thomas Tan on Feb 15, 2019, 5:35 am

Dear all,

We have a project including one main building which is need to meet LEED standard. Beside this building, we have other supporting buildings such as an existing canteen, a new...

Last reply: Dionisio Franca, Feb 25, 2019, 6:35 pm

Parking spaces under tree canopy can be counted under the Option 2: Parking under cover

NC-v4 SSc5: Heat Island Reduction
posted by Thomas Tan on Feb 18, 2019, 1:55 am

Dear LEED Experts,

Our parking spaces consist of two parts: one park is under a roof...

Last reply: Afogreen Build, Jul 27, 2023, 2:22 am

Low emitting materials- insulation category.

NC-v4 EQc2: Low-emitting materials
posted by Keith Robertson on Feb 22, 2019, 1:54 pm

comments Mark Andrews LEEDuser Basic Member April 23, 2024- 4:00 am According to the LEED user forum post, LEED v4.1 defines low-emitting materials for insulation to include a broad range of insulation...

Last reply: Susan Di Giulio, Apr 23, 2024, 1:01 pm

"Phenolic Backed..."?

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by emily reese moody on Mar 5, 2019, 10:42 pm

Hi all, 

I see the LI, LEEDuser guidance, and some posts related to MUF or MF being OK, and...

Last reply: emily reese moody, May 9, 2019, 4:47 pm

Option 2- Carbon dioxide monitoring

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Marina Curto on Mar 8, 2019, 5:32 am

We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered. Are we...

Last reply: Mujib ur Rehman, Jul 21, 2024, 1:29 am

Double skin facade

NC-v4 EAp2: Minimum Energy Performance
posted by Sarah Leenknegt on Mar 12, 2019, 3:48 am

Hi

How do I model a naturally ventilated double skin facade in proposed and baseline building?

- proposed building: as designed, with a thermal zone for the intermediate area. The...

Last reply: Sarah Leenknegt, Mar 26, 2019, 3:21 am

Building Area Method and System designation

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge Lopez de Obeso on Mar 15, 2019, 1:30 pm

Hello everyone, I have a project with the following conditioned area categorization.

1st to 5h Floor are composed by:

Assembly areas: 59,232 sq ft (considering hotel service areas...

Last reply: Jorge Lopez de Obeso, Mar 19, 2019, 3:20 pm

Core & Shell” version of the “LEED BD+C: Warehouses and Distribution Centers

LEED Rating System Selection
posted by Ricardo Sá on Mar 27, 2019, 1:20 pm

Dear...

Last reply: Michelle Rosenberger, Apr 9, 2021, 2:29 pm

Tenant lighting savings without layout

CS-v4 EAp2: Minimum Energy Performance
posted by Przemysław Rejczak on Mar 28, 2019, 11:06 am

Dear Everyone,

Generaly for CS project we model tenant spaces as unfinnished and we use perimeter/core zonning method.

We are in the middle of creating one project where tenant...

Last reply: Marcus Sheffer, Mar 29, 2019, 8:51 am