Topic | Recent |
---|---|
Zero lot line projects with no parking providedNC-v4 LTc8: Green vehiclesposted by Summer Gorder on Feb 13, 2019, 12:10 pm
What are options for zero lot projects with no parking provided in an urban context? Also, the project is a Health Department HQ, but does have truck loading. Can the warehouse option for Reduced... Last reply: Dave Hubka, Mar 16, 2020, 2:38 pm |
|
Exclusion of supporting buildings from LEED boundary?NC-v4 MPR2: Must use reasonable LEED boundariesposted by Thomas Tan on Feb 15, 2019, 5:35 am
Dear all, We have a project including one main building which is need to meet LEED standard. Beside this building, we have other supporting buildings such as an existing canteen, a new... Last reply: Dionisio Franca, Feb 25, 2019, 6:35 pm |
|
Parking spaces under tree canopy can be counted under the Option 2: Parking under coverNC-v4 SSc5: Heat Island Reductionposted by Thomas Tan on Feb 18, 2019, 1:55 am
Dear LEED Experts, Our parking spaces consist of two parts: one park is under a roof... Last reply: Afogreen Build, Jul 27, 2023, 2:22 am |
|
Low emitting materials- insulation category.NC-v4 EQc2: Low-emitting materialsposted by Keith Robertson on Feb 22, 2019, 1:54 pmcomments Mark Andrews LEEDuser Basic Member April 23, 2024- 4:00 am According to the LEED user forum post, LEED v4.1 defines low-emitting materials for insulation to include a broad range of insulation... Last reply: Susan Di Giulio, Apr 23, 2024, 1:01 pm |
|
"Phenolic Backed..."?NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by emily reese moody on Mar 5, 2019, 10:42 pm
Hi all, I see the LI, LEEDuser guidance, and some posts related to MUF or MF being OK, and... Last reply: emily reese moody, May 9, 2019, 4:47 pm |
|
Option 2- Carbon dioxide monitoringNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Marina Curto on Mar 8, 2019, 5:32 am
We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered. Are we... Last reply: Mujib ur Rehman, Jul 21, 2024, 1:29 am |
|
Double skin facadeNC-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Mar 12, 2019, 3:48 am
Hi How do I model a naturally ventilated double skin facade in proposed and baseline building? - proposed building: as designed, with a thermal zone for the intermediate area. The... Last reply: Sarah Leenknegt, Mar 26, 2019, 3:21 am |
|
Building Area Method and System designationNC-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Mar 15, 2019, 1:30 pm
Hello everyone, I have a project with the following conditioned area categorization. 1st to 5h Floor are composed by: Assembly areas: 59,232 sq ft (considering hotel service areas... Last reply: Jorge Lopez de Obeso, Mar 19, 2019, 3:20 pm |
|
Core & Shell” version of the “LEED BD+C: Warehouses and Distribution CentersLEED Rating System Selectionposted by Ricardo Sá on Mar 27, 2019, 1:20 pm
Dear... Last reply: Michelle Rosenberger, Apr 9, 2021, 2:29 pm |
|
Tenant lighting savings without layoutCS-v4 EAp2: Minimum Energy Performanceposted by Przemysław Rejczak on Mar 28, 2019, 11:06 am
Dear Everyone, Generaly for CS project we model tenant spaces as unfinnished and we use perimeter/core zonning method. We are in the middle of creating one project where tenant... Last reply: Marcus Sheffer, Mar 29, 2019, 8:51 am |