Topic | Recent |
---|---|
Nonpotable water sourceNC-v4 WEc2: Indoor water use reductionposted by Ricardo Sá on Oct 2, 2018, 8:04 am
Hi, according to Reference Guide, Nonpotable water is water that does not meet drinking water standards. Given this, if water from well is classified as Nonpotable water by... Last reply: Francesca g, Jul 23, 2021, 11:07 am |
|
Downloading archived projects from USGBC project downloadLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Deborah Lucking on Oct 2, 2018, 2:45 pmas a reply on this forum if it is only one you are having trouble with? FYI: Having this new download makes me wonder if USGBC is planning to transition us out of LEED Online and they are planning for another... Last reply: Deborah Lucking, Oct 26, 2018, 1:28 pm |
|
Split review for BD+C LEED v4LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Konstantina Kalliakoudi on Oct 8, 2018, 4:22 am
Hello to all, I am going to start my first project and I have following questions: Ι am going for the Design Review first. 1) Is it possible to make for the design credits... Last reply: Konstantina Kalliakoudi, Oct 11, 2018, 3:07 am |
|
Energy Model Scope for CI Project with independent HVAC systemCI-v4 EAc2: Optimize Energy Performanceposted by Marie Garcia on Oct 9, 2018, 5:07 am
hi Marcus / hi everyone, We have a LEED CI project that is part of a 4 storey commercial building. Only portion of the Ground Floor will be part of the LEED CI project. Each tenant space... Last reply: Marie Garcia, Oct 10, 2018, 11:37 pm |
|
IEQ PreReq- Carbon monoxide monitoringNC-v4 EQp1: Minimum indoor air quality performanceposted by Kim C on Oct 11, 2018, 1:59 am
The pre-requisite criteria speaks of having Carbon monoxide monitors installed in each dwelling unit. However, it is not common for dwelling units in Malaysia/Singapore to have such... Last reply: Rodolfo Loro, Jr., Oct 15, 2020, 12:47 am |
|
Option 2- Based on GSF, excluding garage area but including garage CDW?NC-v4 MRc5: Construction and demolition waste managementposted by Michelle Bombeck on Oct 15, 2018, 8:02 pm
It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in... Last reply: RETIRED, Jan 21, 2019, 5:25 pm |
|
Open space outside LEED project boundaryNC-v4 SSc3: Open spaceposted by Omar Elrawy on Oct 20, 2018, 7:31 am
I have a zero lot line project,... Last reply: Tristan Roberts, Oct 26, 2018, 11:09 am |
|
Design or Construction Phase?Pilot-Credits EQpc44: Ergonomics approach for computer usersposted by Allison Smith on Oct 23, 2018, 6:48 pm
Reviewing the credit requirements, I thought that this should be submitted at the Construction phase. However, the Infographic (... Last reply: Todd Lynch, Mar 2, 2020, 12:57 pm |
|
credit calculations for historic buildingNC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Debra a. Lombard on Oct 26, 2018, 10:40 amMember 46 thumbs up July 30, 2019- 5:02 pm Hi Tristan, I saw on your website the following under MRc2: https://leeduser.buildinggreen.com/forum... Last reply: Debra a. Lombard, Jul 31, 2019, 11:27 am |
|
Is a plasterboard a inherently nonemitting source?NC-v4 EQc2: Low-emitting materialsposted by J Schütz on Oct 29, 2018, 9:46 am
Dear all, does a plasterboard panel count as a inherently nonemitting source, even so it is wraped in paper? Best regards and thank you Last reply: Paula Melton, Nov 5, 2018, 12:27 pm |