Topic | Recent |
---|---|
ID#100002123NC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Agnieszka Rylska on Oct 23, 2017, 7:04 am
Hello, We received the document, confirming that the product manufacturer operates an environmental management system which complies with the requirements of ISO 14001:2004. Accordingly to... Last reply: Agnieszka Rylska, Oct 23, 2017, 10:06 am |
|
Excluding Kitchens and other F&B spaces within a stadium from Quality ViewsNC-v4 EQc8: Quality Viewsposted by Quentin Jackson on Oct 25, 2017, 3:14 am
Hi there, I'm working on a stadium in Australia (LEED v4 NC). On the concourse there are multiple kitchen areas - note I am talking about the cooking and food preparation areas not... Last reply: TODD REED, Oct 26, 2017, 9:09 am |
|
Concrete pavers on roofNC-v4 SSc5: Heat Island Reductionposted by Max Zayika on Oct 30, 2017, 10:13 am
Dear All, I have a project that's located in Europe. The buiding will have an accessible roof terrace which will be paved with white concrete pavers. The manufacturer does not offer any... Last reply: Max Zayika, Nov 2, 2017, 5:53 am |
|
One Tenant- two spaces across a public corridor- can this be certified as one project?CI-v4 MPR2: Must use reasonable LEED boundariesposted by Helen Kessler on Oct 31, 2017, 2:16 pm
The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor. Seems to me this is no different from a tenant that is on multiple... Last reply: Dave Hubka, Jan 3, 2024, 8:25 am |
|
Membrane roof- materials at interior side of vapor barrier?NC-v4 EQc2: Low-emitting materialsposted by Joanna Switzer on Nov 3, 2017, 3:48 pm
Hi all, Based on BD+C reference guide, it appears all materials installed to interior side of vapor barrier need to comply. However, I am finding it challenging to locate roof... Last reply: Joanna Switzer, Dec 7, 2017, 12:49 pm |
|
Diverse Uses within Existing Building on Addition ProjectNC-v4 LTc4: Surrounding density and diverse usesposted by Eric White on Nov 8, 2017, 4:59 pm
Our project is a 5 storey addition to the east side of an existing campus centre. It will be connected on various levels to the campus centre and most occupants are expected to enter the addition... Last reply: Kara Strong, Apr 2, 2019, 2:33 pm |
|
Envelope of a restaurant in an existing buildingCI-v4 EAp2: Minimum Energy Performanceposted by Javier Manzanero on Nov 19, 2017, 10:30 am
I'm working in a restaurant to be located in a space contained in an existing building. This space has 2 facades to outdoor space, but the owner don't let us modify any element of the existing... Last reply: Javier Manzanero, Nov 20, 2017, 1:19 pm |
|
Does 5% have to be landscaped to achieve 2 points?NC-v4 WEc1: Outdoor water use reductionposted by Laura Charlier on Nov 29, 2017, 2:32 pm
I did not notice a minimum percentage of landscaped area (5% has traditionally been the minimum). Is this longer a stipulation? Last reply: Deborah Lucking, Jul 16, 2019, 12:07 pm |
|
recyclable storage area outside the boundaryNC-v4 MRp1: Storage and Collection of Recyclablesposted by Larissa Murakami on Dec 8, 2017, 6:28 am
Would it be possible to use an area outside the boundary for the recyclable storage area? We are with the office of a company in the process of certification, but still on the ground there is the... Last reply: Shannon Oletic, Oct 31, 2019, 4:30 pm |
|
EAc6 formNC-v4 EAc6: Enhanced Refrigerant Managementposted by Jens Apel on Dec 13, 2017, 9:16 am
Does anyone have access to a working LEED Online template? My project is in precertification, forms not yet available. The one on the USGBC online access website is broken, or gets broken... Last reply: Jens Apel, Dec 15, 2017, 3:39 am |