Log in
Forum
Topic

LEEDuser waste audit template updated

EBOM-2009 MRc6: Solid waste management - waste stream audit
posted by Tristan Roberts on Feb 3, 2014, 12:11 pm

Hi — the waste audit template provided to LEEDuser members through our Doc Toolkit (see above) has been updated. We found that our waste audit reports were being flagged by...

Hotel Guest Room Controllability

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Tom Warner on Feb 6, 2014, 3:52 pm

The IEQ Space Matrix indicates that hotel guest rooms can be excluded from the calculations for both IEQc6.1 Controllability of Systems - Lighting and IEQc6.2 Controllability of Systems - Thermal...

Renovate an old school

Schools-EBOM-v4 MPR3: Must comply with project size requirements
posted by Davide Filippi on Feb 12, 2014, 2:55 am

I'm working to certify a school in LEED EB:OM v4. The project wants to change all the spaces inside the school: different number of classrooms, a bigger canteen, new laboratories, big hall to...

MPR for LEED 2009 ND

ND-v2009 PIf1: Development Program and Site Type
posted by Jin Yang on Feb 15, 2014, 11:41 pm

Hi Eliot,

Currently I'm working on a LEED ND project in Wuhan, China. I'd like to find out if a project must apply for LEED NC certification in order to be certified for LEED ND as part of...

Surrounding Density and Diverse Uses

General forums
posted by Melissa Wrolstad on Feb 18, 2014, 3:54 pm

Hello,

The Surrounding Density and Diverse Uses credit is 71% more stringent in LEED v3 than LEED v4 (requirement in LEED-CI dropped from 60,000 sqft/acre for 6 pts to 35,000 sqft/acre for...

Included Furniture

Schools-2009 IEQc4.5: Low-Emitting Materials—Furniture and Furnishings
posted by Johannes Gellrich on Feb 19, 2014, 8:26 am

Hello all,
I have problems to determine the necessary extent of furniture:
The guide says "Classroom furniture including all Student and teacher desks [...]".
Do we only have to...

Are the units wrong in ”Indoor Air Quality Assessment” (EQc4)?

General forums
posted by Maria Porter on Feb 20, 2014, 3:00 am

Option 1 is about flush-out. I’m interpreting path 1 to be that a certain volume of air is supposed to pass through the system before occupancy and path 2 to be first a volume before occupancy...

Form Releasing Agents VOC Requirements

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Samantha Nourse on Feb 21, 2014, 11:10 am

I have a subcontractor proposing to use a Form Releasing Agent with a...

smoking space in annex

CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Noriko Nagazumi on Feb 25, 2014, 3:12 am

Hello,

Our project has a 1-story annex building which is separated from the...

What about metal structure or legs of workstation?

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Jim Park on Feb 25, 2014, 8:03 pm

One project is purchasing Greenguard certified workstation (panel), however my client told me that the metal legs are going to be provided by other vendor. Do metal...