Topic | Recent |
---|---|
What was your LEED deliverable after the site assessment?Healthcare-v2009 SSp2: Environmental Site Assessmentposted by Jill DeMarotta on Aug 13, 2013, 4:10 pm
What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks- |
|
Plenum ZonesNC-2009 EAc1: Optimize Energy Performanceposted by Rosana Correa on Aug 19, 2013, 11:12 am
Hello, In the proposed design, the HVAC system operates using plenum zones as return air path. Should I use the plenums as return air path in the baseline model as well? Thank you... |
|
EAp2 Sample L4 NarrativeCS-2009 EAp2: Minimum Energy Performanceposted by Thomas Newbold on Aug 21, 2013, 11:21 pm
Are there any sample narratives available on LEEDUser to satisfy Upload L-4? "Provide a detailed narrative describing the intended credit Files: approach, including energy efficiency... |
|
Flush out in tropical climate region (Climate Zone 1)NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Adi Negara, LEED AP BD+C on Aug 29, 2013, 6:15 am
Hello, Our project is in Indonesia (... |
|
Pressure and flow ratesNC-2009 WEp1: Water Use Reductionposted by Mike D on Aug 29, 2013, 6:49 am
We have come across an issue regarding flowrates and pressure. LEED states 2.5 gallons per minute at 80 psi for showers for example. Our manufacturer data sheet states 1.53... |
|
Australian equivalent of fuel-efficient vehiclesNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Mary Haw on Sep 4, 2013, 9:20 pm
Our project is based in Australia and is targeting certification under both LEED and the local rating system, Green Star. The project is providing 10% small car parking spaces dedicated... |
|
BREEAM and LEEDGeneral forumsposted by Younha Rhee on Sep 6, 2013, 5:50 am
I am currently working on multiple... |
|
LEED Scorecard FormsGeneral forumsposted by Clara Simon on Sep 6, 2013, 3:04 pm
I am attempting to post on the UW's website a consistent appearance of the scorecards earned on UW LEED projects, so that I can provide a link on each project... |
|
Core performance pathNC-2009 EAc1: Optimize Energy Performanceposted by Jatuwat Varodompun on Sep 7, 2013, 8:50 pm
Core performance path We plan go for the option 3 the core performance 1 For Section 2.9 equipment efficiency, We have 500,000+... |
|
Remediating to "residential (unrestricted) use"Healthcare-v2009 SSp2: Environmental Site Assessmentposted by Kathy Wislocky on Sep 12, 2013, 11:46 am
Is it feasible for a LEED HC project to meet this prerequisite without being remediated to a "residential (unrestricted) use?" After speaking with our environmental consultant, this would... |