Log in
Forum
Topic

What was your LEED deliverable after the site assessment?

Healthcare-v2009 SSp2: Environmental Site Assessment
posted by Jill DeMarotta on Aug 13, 2013, 4:10 pm

What have you provided as a deliverable for this credit? Was it the EPA's Ready for Reuse form? Our inspecting authority is not sure what to provide to appease the LEED reviewer. Thanks-

Plenum Zones

NC-2009 EAc1: Optimize Energy Performance
posted by Rosana Correa on Aug 19, 2013, 11:12 am

Hello,

In the proposed design, the HVAC system operates using plenum zones as return air path. Should I use the plenums as return air path in the baseline model as well?

Thank you...

EAp2 Sample L4 Narrative

CS-2009 EAp2: Minimum Energy Performance
posted by Thomas Newbold on Aug 21, 2013, 11:21 pm

Are there any sample narratives available on LEEDUser to satisfy Upload L-4?

"Provide a detailed narrative describing the intended credit Files: approach, including energy efficiency...

Flush out in tropical climate region (Climate Zone 1)

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Adi Negara, LEED AP BD+C on Aug 29, 2013, 6:15 am

Hello,

Our project is in Indonesia (...

Pressure and flow rates

NC-2009 WEp1: Water Use Reduction
posted by Mike D on Aug 29, 2013, 6:49 am

We have come across an issue regarding flowrates and pressure.

LEED states 2.5 gallons per minute at 80 psi for showers for example.

Our manufacturer data sheet states 1.53...

Australian equivalent of fuel-efficient vehicles

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Mary Haw on Sep 4, 2013, 9:20 pm

Our project is based in Australia and is targeting certification under both LEED and the local rating system, Green Star.

The project is providing 10% small car parking spaces dedicated...

BREEAM and LEED

General forums
posted by Younha Rhee on Sep 6, 2013, 5:50 am

I am currently working on multiple...

LEED Scorecard Forms

General forums
posted by Clara Simon on Sep 6, 2013, 3:04 pm

I am attempting to post on the UW's website a consistent appearance of the scorecards earned on UW LEED projects, so that I can provide a link on each project...

Core performance path

NC-2009 EAc1: Optimize Energy Performance
posted by Jatuwat Varodompun on Sep 7, 2013, 8:50 pm

Core performance path

We plan go for the option 3 the core performance

1 For Section 2.9 equipment efficiency, We have 500,000+...

Remediating to "residential (unrestricted) use"

Healthcare-v2009 SSp2: Environmental Site Assessment
posted by Kathy Wislocky on Sep 12, 2013, 11:46 am

Is it feasible for a LEED HC project to meet this prerequisite without being remediated to a "residential (unrestricted) use?"

After speaking with our environmental consultant, this would...