Log in
Forum
Topic

5% Requirement Clarification

EBOM-2009 WEc3: Water Efficient Landscaping
posted by Marie Gruel on Jul 29, 2011, 1:20 am

I have a zero lot line project,...

Last reply: Tristan Roberts, Jul 29, 2011, 1:21 pm

LEED- CI PI Form 3

General forums
posted by Holly Himes on Jul 29, 2011, 12:07 pm

Do I need to list out office space versus conference room versus copy room etc. on the Space Usage Type of this form?

Last reply: David Posada, Jul 29, 2011, 12:46 pm

PI Form How to calculate FTEs

General forums
posted by Holly Himes on Jul 29, 2011, 12:11 pm

I am confused on the Occupant Information section. We are building a conference center which will most likely have non 8-hour work days. How do I calculate FTEs. Does someone have a...

Last reply: David Posada, Jul 29, 2011, 12:43 pm

Case 2 Site with little decrease in Impervious Ratios

NC-2009 SSc6.1: Stormwater design - quantity control
posted by ryan mclean on Jul 5, 2011, 11:14 am

I am in the processing of accessing the feasibility of attaining this credit with a site that is currently 88% impervious and the proposed site is roughly 81% impervious. While i will be able to...

Last reply: Susann Geithner, Jul 29, 2011, 10:44 am

At least in the older LEED

General forums
posted by Michelle Robinson Schwarting on Apr 13, 2011, 11:36 am

At least in the older LEED Online, after you received request for clarifications for credits you can select to pursue credits that were not previously submitted. HOWEVER, you'll only get the one...

Last reply: Steve Offutt, Jul 29, 2011, 8:55 am

Master Site Registration Costs?

LEED Guidance for Campuses and Multiple Buildings
posted by Eric Dixon on Dec 16, 2010, 3:13 pm

of Representatives LEEDuser Expert 11470 thumbs up January 21, 2011- 9:38 am Brittany, I'm not sure this will help, but I thought of you just now when I saw this post by Cara Mae on the MPR forum. Log...

Last reply: Karen Joslin, Jul 28, 2011, 3:50 pm

Exempt compounds

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Paola Figueiredo, Newton Figueiredo on Jul 15, 2011, 5:07 pm

The LEED´s definition of...

Last reply: Susan Walter, Jul 28, 2011, 2:46 pm

Interior concrete stain

Schools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
posted by Chris Sanders on Jun 22, 2011, 2:12 pm

Does interior concrete floor stain fall into the Floor Coatings category, with 100 g/L...

Last reply: Dwayne Fuhlhage, Jul 28, 2011, 1:15 pm

Flag Pole Light & ASHRAE LPD calculations

EBOM-2009 SSc8: Light Pollution Reduction
posted by Art Kamm on Jul 28, 2011, 1:03 pm

ASHRAE/IESNA Standard 90.1-2007 does not specify on...

Compliance if there are no fixtures on the design

CS-2009 WEc3: Water Use Reduction
posted by Jose Salinas on May 26, 2011, 11:31 am

Hi,
The Owner is constructing a tower with high end tenants on the his scope. He wants to leave to the tenant the installation of the water fixtures to give them freedon on the design...

Last reply: Devon Bertram, Jul 28, 2011, 12:43 am