Topic | Recent |
---|---|
ID&C- EApr1- preventing ID&C projects from achieving LEED?General forumsposted by Melissa Wrolstad on Mar 11, 2013, 2:31 pm
To achieve the ID&C EApr1 – Fundamental... |
|
asbestos roofGeneral forumsposted by Tristan Roberts on Mar 11, 2013, 5:06 pm
No, LEED does not have specific requirements such as replacing certain kinds of roofing. The only requirement that is relevant is the one to comply with all relevant environmental laws, which... |
|
WR p3 and EA p3 Building-Level MonitoringGeneral forumsposted by Timothy Nabholz on Mar 13, 2013, 9:41 am
Hey all, I have been doing a review of the 6th Public Comment Draft of v4 for BD+C and noticed something that seems a bit strange to me. The last sentences in these two credits reads "... |
|
LEED v4 Sixth Public CommentGeneral forumsposted by Tristan Roberts on Mar 13, 2013, 3:32 pm
LEEDuser is hosting a forum devoted to the LEED v4 sixth public comment period, with key links, here. Let's take the v4... |
|
WR p3 and EA p3 Building-Level MonitoringGeneral forumsposted by Timothy Nabholz on Mar 14, 2013, 4:39 am
Hey all, |
|
Clogging Issues with Low Flow FixturesNC-2009 WEp1: Water Use Reductionposted by Melissa Perry on Mar 15, 2013, 11:43 am
We installed low flow toilets throughout our newly constructed 1.3 million square foot building and now experience line clogging issues. We still believe the installation of the fixtures was the... |
|
PC 25 Water Metering and Reporting- FeedbackPilot-Credits PC25: Water Metering and Reportingposted by SOFIA KESIDOU on Mar 18, 2013, 6:51 am
The pilot credit aligns with the overall direction and advancement of LEED and compliance with this credit spurs market innovation/transformation. The projected annual water use calculations for... |
|
PC 26 Advanced Energy Metering- FeedbackPilot-Credits PC26: Advanced Energy Meteringposted by SOFIA KESIDOU on Mar 18, 2013, 6:59 am
This pilot credit aligned perfectly with our project’s environmental and building operating cost reduction goals. The visibility provided is fundamental to the operation and management of a... |
|
What's the surprise new MR option in LEED v4 all about?General forumsposted by Tristan Roberts on Mar 19, 2013, 3:59 pm
I posted an article in its own LEEDuser forum going into more depth on what MRc4 Option 3 is all about. Please read it here... |
|
USGBC as Code OfficialsGeneral forumsposted by Hernando Miranda on Mar 20, 2013, 1:04 pm
The USGBC has been a code and rules enforcement organization for some time now. They are mush less about green, and more about policy, making up rules, following rules, and then revising the... |