Topic | Recent |
---|---|
n/aNC-2009 EAp2: Minimum Energy Performanceposted by Haojie Wang on Mar 17, 2015, 11:31 am
I wonder if there is a standard to convert C-factor to U-factor or F-factor to U-factor. Is there a guideline to do so? Since not all energy program can let you input C, U, F as you desire.... Last reply: Haojie Wang, Mar 18, 2015, 10:27 am |
|
IEQP1 Online templateNC-2009 IEQp1: Minimum indoor air quality performanceposted by Stella Stella on Mar 23, 2015, 3:06 am
Hi All, Last reply: Stella Stella, Mar 24, 2015, 10:19 pm |
|
Innovation and Design- Green Building EducationNC-2009 IDc1: Innovation in Designposted by Rick Alfandre on Mar 23, 2015, 10:17 am
We are in between preliminary and final design review, and are thinking of pursuing an I&D credit for Green Building Education. It is not clear to us from reviewing the information if it is... Last reply: Francisco Infante, Aug 24, 2015, 9:33 am |
|
What is the acceptable testing standard for runoff coefficient.NC-2009 SSc6.1: Stormwater design - quantity controlposted by Panupant Phapant on Mar 30, 2015, 11:54 am
Dear All Can anyone advise what is acceptable testing... Last reply: Panupant Phapant, Apr 15, 2015, 9:53 pm |
|
Air Curtain in conditioned spaceNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Mar 30, 2015, 12:54 pm
How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed? Last reply: Jatuwat Varodompun, Mar 30, 2015, 9:20 pm |
|
Can a hotel+residential tower achieve this credit?NC-2009 IEQc7.2: Thermal comfort - verificationposted by Abena Darden on Apr 2, 2015, 3:23 pm
I have a hotel + residential tower project with approx 50-50 break up. Can this project achieve Thermal Verification credit? Last reply: GBD Architects, Apr 12, 2018, 5:59 pm |
|
Meeting 20% with no Operational ActivityEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Michelle Rosenberger on Apr 7, 2015, 12:38 pm
What do I do with the snow and ice removal activity during the performance period if we don't get any snow? It appears the requirement is 20% compliance in each operational area. Is the project... Last reply: Trista Brown, Apr 14, 2015, 10:46 am |
|
Transitional Entry Atrium Lobby belong in Energy Model?NC-2009 EAp2: Minimum Energy Performanceposted by Joyce Kelly on Apr 13, 2015, 2:53 pm
A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use. There are no desks or offices located in... Last reply: Jean Marais, Apr 14, 2015, 12:55 am |
|
Lighting Energy Efficiency as a Lease requirementCS-2009 EAp2: Minimum Energy Performanceposted by Scott McMillan on Apr 13, 2015, 7:11 pm
We are compiling the LEED submission for an office tower that may have multiple tenants on each floor. Last reply: Charalampos Giannikopoulos, Jun 17, 2015, 4:01 pm |
|
Basement lobbiesNC-2009 IEQp1: Minimum indoor air quality performanceposted by Marni Punt on Apr 14, 2015, 4:48 am
We have a project with 3 lobbies located in basement parking. The lobbies are not regularly occupied spaces, but are circulation spaces connecting to the main reception and lobby on the Ground... Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:07 pm |