Forum quick links
EBOM on Core and Shell (not LEED) building
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by LEED Pro Consultant on
We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.
PBE Edifica for EAp2 compliance
CS-2009 EAp2:Minimum Energy Performanceposted by Mauricio Torres on
Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.
Indoor/Outdoor Pool
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Tom Liebel on
We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an outdoo
NC V4: Advanced Energy Metering of Entire Building
NC-v4 EAc3:Advanced energy meteringposted by Erik Gutierrez on
Hello all, I'm looking at metering a new construction building with a single controller.
EAp1-1 Commissioning Report Upload Location Missing
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Sam Stoltze on
The new LEED Online interface seems to be missing the ability to upload a commissioning report.
Submitting New Design Credits During Construction Review
posted by Charlie Haas on
I am working on a project that underwent a split review. We have received and accepted our final design review submission.
Breakdown of HVAC points
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Chilufya Lombe on
Hi, for the HVAC Equipment points (5), our project meets the requirements of sections 1.4 and 2.9 of the core performance guide but not 3.10 since the system is constant volume (as most VRF and inv
Double skin façade. Baseline-Proposed building modeling approach
NC-2009 EAp2:Minimum Energy Performanceposted by Alex Parella on
We are modeling a new building in a previously developed site, with some remains of the previous building. One of the project strategies is to step aside the building façade (2 m, approx) and maint
"Mixed C&D"
NC-2009 MRc2:Construction Waste Managementposted by Esmeralda Ward on
On a current project under construction the contractor's waste hauler has been submitting monthly reports that have a list of materials on it, including Wood, Concrete, etc.
Mandatory for plug fans
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Is Table 10.8 mandatory for plug fans of new buildings? The fans are installed in Air Handling Units. If they are mandatory, are they mandatory both for supply fans and for return fans?