Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Charrette duration / delivery flexible?

NC-v4 IPc1:Integrative process
posted by  Vince Briones  on 

Has anyone had success with (2) 2-hr sessions being accepted as compliant (by GBCI) for the integrated design team charrette?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 20, 2015, 7:47 pm

Actual building floor area and modeled floor area

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I wonder if there is a rule on how much the difference between the actual and modeled floor area can be in LEED. Thanks

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Fri Feb 20, 2015, 10:07 am

appendix of ieqp1 template vs 62MZcalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  J.W. Shin  on 

Is there someone who experience any result differences between template and 62MZcalc? I put some data into 62MZcalc, then I tried to let them into template either. But, in my case, value of Ev wasn

2
Thu Feb 19, 2015, 5:19 pm

Part-load efficiency (IEER)

NC-v4 EAp2:Minimum energy performance
posted by  Charalampos Giannikopoulos  on 

According to Table 6.8.1B of ASHRAE 90.1.2010 it is required that the baseline HVAC systems serving spaces have a specific full-load and part-load efficiency.

3
Thu Feb 19, 2015, 3:37 pm

Glare control

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Belén Valladares López  on 

Hi, We're working in a project trying to achieve this credit by option 3 (measurement). Our façade is an existing curtain wall. There are two different skins.

3
Thu Feb 19, 2015, 2:40 pm

Guidance on calculations with multiple inputs

Schools-2009 MRc4:Recycled Content
posted by  Esther Kohout  on 

Where would I find the information needed to calculate the recycled content of a finished product.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Feb 18, 2015, 6:44 pm

CPG - Efficiency Compliance

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Jonathan Caisido  on 

Hello, I would like to know on how to comply CI EAc1.3 if using base build Chilled Water Fan Coil Units.

3
Wed Feb 18, 2015, 3:14 pm

LEED for Homes V4 International

LEED for Homes (LEED-H) Forum
posted by  Emmanuel Pauwels  on 

I am looking for a Green Rater for a multifamily project in Europe. Anyone ? Would not mind getting trained as a Green Rater myself in the process...

2
founder/principal
Design AVEnues LLC
LEEDuser Expert
8 thumbs up
Wed Feb 18, 2015, 9:46 am

MR4 -vs- MR7 credits

NC-2009 MRc7:Certified Wood
posted by  Esther Kohout  on 

I have been told on a number of occasions, that the MR7c only applies to new wood.

22
Director of Sustainability
IPS-Integrated Project Services
LEEDuser Basic Member
6 thumbs up
Tue Feb 17, 2015, 7:15 pm

Note in the form

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

There is the following note in the form: "MULTIPLE ZONE Table IEQp1-A1.

3
Default Avatar
Architectural Technologist, Sustainable Design Consultant
Aurecon South Africa
LEEDuser Basic Member
6 thumbs up
Tue Feb 17, 2015, 1:58 pm