Forum quick links
Pilot Credit 30: No new parking
Pilot-Credits PC30:Alternative Transportationposted by Jon Holway on
Where as multi-family apartment buildings need zoning required parking, as designers of senior independent living facilities, we have found that most municipalities will modify there zoning require
Eligibility for LEED - existing building structure
posted by Agnieszka Rylska on
Our client would like to certify a building that had its structural components and facade built a few years ago.
Dry-Fog coatings
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Lawrence Lile on
I am starting to see a specification for 3. Dry-Fog Coatings: VOC not more than 400 g/L. in MasterSpec and some projects' LEED specs.
wall mounted thermal controller
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Noriko Nagazumi on
Hi, Initial design review has just been returned for our project.
leed credit EAc4
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Dennis Ross on
Having built a cafeteria at a local University we are having trouble getting the Q (tons ) for some of the refrigerated display equipment.
Precision Air Conditioning for Server Room and Art Gallery
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Dear All We have two projects that are attempting LEED 2009 NC Certification the first one is office building with server room and the second one is Arg Gallery.
Component Assembly
NC-2009 MRc5:Regional Materialsposted by Frank Burkhart on
Sorry if this is a rudimentary for all you LEED guru's out there, but I am hoping you can clarify the question I have on a number of items we are specifying for our first LEED project We are speci
Path 7 and 8 reviewer comments, advice for resubmission
CI-2009 SSc1:Site Selectionposted by Keelan Kaiser on
We had a CI project returned without approval for SSc1 paths 7 and 8. It is a school project, an addition, and the owner did not install any irrigation systems.
Duct Sealant
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Yaneth Galindo on
I used a duct sealant with VOC = 49 g/l and I am not sure if it complies with IEQ credit 4.1, because I do not know in which category it falls in the table.
Warehouse Office
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Saul Pichardo, AIA on
My project has a 6,500sf office space serving a 207,000sf warehouse/distribution center (213,500sf total area).