Topic | Recent |
---|---|
Landscape areEBOM-2009 WEc3: Water Efficient Landscapingposted by Mark Frey on Dec 7, 2011, 7:03 am
According to the glossary of the refernce guide, the 'landscape area' is the the total site area less the building footprint, paved surfaces, water bodies and patios. Consequently roof gardens... Last reply: Ben Stanley, Dec 7, 2011, 10:53 am |
|
PC 9- Open & Connected CommunityPilot-Credits PC9: Street Networkposted by albert kovacik on Nov 15, 2011, 1:14 pm
We were on the cusp of Gold level until our review came back with several points deducted from our energy model. Our Green Rater suggested that we look into the Pilot Credit program and felt... Last reply: DARYN EDWARDS, Dec 7, 2011, 9:43 am |
|
MERV 13 filtersCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Paula Hernandez on Dec 4, 2011, 10:30 am
The Guide asks for... Last reply: Dylan Connelly, Dec 6, 2011, 9:02 pm |
|
Meter for BoilersPilot-Credits PC25: Water Metering and Reportingposted by Orlin Velinov, PE on Dec 6, 2011, 6:21 pm
threefold question: |
|
IEQp1 Table. Case 1EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Robert Calloway on Nov 29, 2011, 1:22 pm
I am working on the IEQp1 LEED form and ran into a couple problems when filling out the information. The building I am working on is 12 stories high and has 3 AHUs (in the penthouse) that supply... Last reply: Ben Stanley, Dec 6, 2011, 3:38 pm |
|
No irrigation at allCS-2009 WEc1: Water Efficient Landscapingposted by Yanina Ibañez on Jun 2, 2011, 10:16 am
Hello, in my project there will be no irrigation at all because of the... Last reply: Manny Iglesia, Dec 6, 2011, 3:13 pm |
|
Red Color High SRI?NC-2009 SSc7.2: Heat island effect - roofposted by Omer Moltay on Nov 18, 2011, 4:24 pm
Has anybody heard of red colored roofing membrane that could provide an... Last reply: Ante Vulin, Dec 6, 2011, 1:58 pm |
|
Construction Manager, advisorySchools-2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Terry Squyres on Sep 15, 2010, 12:57 pm
This question goes under a larger umbrella, but this credit highlights the importance of accountability for subcontractors. In our project, the Owner has a contract with a Construction Manager,... Last reply: Manny Iglesia, Dec 6, 2011, 1:41 pm |
|
Plywood sheathingSchools-2009 IEQc4.4: Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Franklin Snyder on Dec 6, 2011, 1:04 pm
I am having a very difficult time locating plywood sheathing that has been tested per the requirements of the California Department of Health Services Standard Practice for the Testing of... Last reply: Josh Jacobs, Dec 6, 2011, 1:27 pm |
|
Main Entry facing a PlazaPilot-Credits PC14: Walkable Streetsposted by Roshini Das on Dec 6, 2011, 1:21 pm
Our project is a dormitory for 1-8 grade kids located in a campus. The main entry faces a plaza, second entry faces a parking cul-de-sac (entry faces the street with parking inside the cul-de-sac... |