Forum quick links
Option 2 Path 1 Brownfield Development
CI-2009 SSc1:Site Selectionposted by Vanessa Seibert on
We are working on a college campus building.
Open Air Lobby/Drop off
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Covello on
Hello, I am working on a project in SE Asia. As with many resorts in SE Asia the lobby is sheltered but open to the exterior of the building.
Preferred parking spaces definition interpretation
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Ricardo Sá on
The definition of preferred parking refers "designated spaces close to the building (...), designated covered spaces (...)".
Greenfield site disturbance statement
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Michael Smithing on
The SSc5.1 form does not indicate who should provide the signed statement.
AP Certification on v2009
CI-2009 IDc2:LEED Accredited Professionalposted by Paul Duva on
I am working on a v2009 LEED project and am the currently the LEED AP on the project for our IDc2 credit. I originally had a LEED AP & a LEED BD+C, however my BD+C has expired.
Inactive storage
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Gustavo De las Heras Izquierdo on
I have read the definition of inactive storage in the space-matrix spreadsheat.
Declining block utility rate
NC-2009 EAp2:Minimum Energy Performanceposted by Mike Fortier on
Hello, Our project is connected to a utility steam network with a declining block utility rate, so as the building uses more steam the rate decreases.
Section 6.4.1.2, crossed ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
I don't know how to interpret the following section of ASHRAE 62.1-2010: "6.4.1.2. Double side openings.
Compare impacts of materials and energy
NC-v4 MRc1:Building life-cycle impact reductionposted by Jody Lee Potvin-Jones on
Hi, We are studying a building in Saudi Arabia that has a fully glazed facade shaded with an exterior facade system made of ultra high performance concrete.
Clarification for Saudi Arabia regional priority credit
NC-2009 MRc2:Construction Waste Managementposted by Daoud Akeileh on
The MRc2: Construction waste management credit is a regional priority credit in UAE one of the Saudi Arabian country eastern boundary and the Saudi Arabia is not one of the listed countries for reg