Forum quick links
4 point mandatory minimum
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Recently an addenda was published to refer that "for projects that register after XX/XX/XX and are subject to the four point mandatory minimum, demonstrate an 18% improvement in the proposed buildi
The amount of REC's necessary if onsite solar credits are sold
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Edmée Knight on
My buildings roof is covered in solar panels that generate at least 20% of the building's annual energy.
Design Phase Submittals
posted by Shannon Deeb on
At what point are design submittals made?
Credit Form Problems
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by James Keohane on
I am having difficulty demonstrating compliance for Option C Occupancy Sensors.
Major Renovation Building Energy Modelling
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All We are currently working on a Major Renovation Building.
LEED Online terminology
posted by Susannah Goddard on
Possibly a bit of a rookie question but... The scorecard page has a drop down which denotes the status of the credit.
Hangar
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
My project is a 93,000 sf open-plan hangar. We are designing grills on walls that count for 4% of the floor area on 2 opposite facades to induce crossed-ventilation.
How to calculate capacity for commercial ice makers?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lindsay Austrom on
I have a project with a commercial kitchen, so we're gathering info on all of the walk-in coolers, freezers, etc.
EA Credit 4: Enhanced Refrigerant Management
NC-2009 EAc4:Enhanced Refrigerant Managementposted by John Pugh on
Hello, Was just wondering if someone could shed some light on the Refrigerant Charge and how I go about finding it? I am using R-410A as the refrigerant. Thanks.
Building Height Requirements
Pilot-Credits PC14:Walkable Streetsposted by Shannon Barras on
I agree with Andrew about the building height requirements for this credit. It is the one area that may need to be looked at further.