walk-in closets in residential

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Alfonzo Collins  on 

I would like to know if there's any way I can consider walk-in closets in a residential building as unoccupied spaces.

5
Thu Jul 20, 2017, 2:36 am

Material Streams in New Construction

NC-v4 MRc5:Construction and demolition waste management
posted by  Allison Wilson  on 

My best understanding is that there are five possible material diversion streams: - Commingled recycled - Donated - Recycled – source separated - Reused - Salvaged My question is this: how do you

2
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Wed Jul 19, 2017, 10:45 pm

Borrowing EBOM Credits for ID

CI-2009 IDc1:Innovation in Design
posted by  Daniel Zaneto  on 

We plan to borrow from the EBOM rating system for two of our ID credits, WEc4 Cooling Tower management, and MRc4 Reduced mercury in lamps.

8
Wed Jul 19, 2017, 10:42 pm

Number of Trips

EBOM-v4 LTc1:Alternative transportation
posted by  JOHN COOK  on 

On the Alternative Transportation Calculator does " number of vehicle trips" imply one way or round trip?

5
Wed Jul 19, 2017, 7:16 pm

updated low-mercury lamps requirements

NC-2009 IDc1:Innovation in Design
posted by  emily reese moody  on 

We have used the low-mercury lamps credit on numerous v3 projects with no problems, even since they lowered the threshold from 90 picograms to 35; the majority of our projects now use either all LE

4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Jul 19, 2017, 7:11 pm

ALL LED project

NC-2009 IDc1:Innovation in Design
posted by  Nelina Loiselle  on 

Hello, I am currently working on a project where all lighting is LED (exterior and Interior).

4
Sustainability Professional
Bright Green
LEEDuser Basic Member
31 thumbs up
Wed Jul 19, 2017, 6:47 pm

Daylight Controls required for task lighting?

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Robin Bass  on 

It seems innappropriate to include task lights that are plug powered in the "connected lighting load" for daylighting controls.

3
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Jul 19, 2017, 3:00 pm

Minimum Energy Performance Calculator v04

CS-v4 EAp2:Minimum energy performance
posted by  Martin K  on 

Hi all, I have a problem with Minimum Energy Performance Calculator for v4. I need to choose the DES path within the General Info tab and I'm not allowed to do any change.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Tue Jul 18, 2017, 2:18 pm

Natural Gas Fired Heat Pump

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Crystal Wu  on 

Dear all, we have a project in Japan that uses natural gas fired heat pump to provide heating and cooling.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jul 18, 2017, 4:11 am

Excellent Modeling Guide

NC-v4 EAp2:Minimum energy performance
posted by  Marcus Sheffer  on 

In case you have not seen this relatively new guide I would highly recommend it to help with your modeling issues. ANSI/ASHRAE/IES Standard 90.1-2010 Performance Rating Method Reference Manual h

2
LEEDuser Basic Member
4 thumbs up
Mon Jul 17, 2017, 4:20 pm