Forum quick links
Exemplary performance documentation
NC-2009 MRc2:Construction Waste Managementposted by Kavita K on
Working on a project which is using NC 2009 version. We have to submit for construction preliminary review, We have achieved 97% const.
Project using EApc67 for Minimum and Optimize Energy Performance
Pilot-Credits EApc67:Energy Jumpstartposted by Greg Romanczyk on
We've registered for EApc67 for our LEED O+Mv4 project.
District calculation
Retail-CI-v4 EAc5:Enhanced refrigerant managementposted by Gustavo De las Heras Izquierdo on
Hallo, After reading "further explanation" section of the Reference Guide (page 201) we are wondering how calculations should be made for a district plant where the commercial interior is served b
LEED management for multi-prime contractor project
NC-2009 MRc4:Recycled Contentposted by Chris Gutsche on
We have a LEED 2009 institutional project with 12 prime contractors. There is a construction management entity with oversight of the 12 primes.
Base building HVAC Efficiency and Baseline & Proposed WWR
CI-v4 EAp2:Minimum energy performanceposted by ESD Engineer on
Hi, The projects space is served by the base building AHU and Chiller plants. Efficiency of which don't meet the min prescribed efficiency as per ASHRAE 90.1-2010.
Baseline Ratios
CI-v4 LTc5:Reduced parking footprintposted by Kena David on
I am having a similar problem like many who have posted here with no reply. Could you please provide guidance as to how to interpret the Institute of Transportation Engineers tables?
Building Flush Out Inquiry
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Sheena Moses on
We are currently working on an EBOM Retail project which is undergoing fit out works to the common mall and tenant areas.
Wash Bay Water Use
NC-v4 WEc2:Indoor water use reductionposted by caroline schroeder on
The building that I am currently working on features a single wash bay for large service trucks. I am wondering how this will effect my indoor water use.
LEED Form MR 4
NC-2009 MRc4:Recycled Contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Geothermal energy loads
NC-2009 EAp2:Minimum Energy Performanceposted by Tim Murray on
We are designing a classroom building on a university campus that will house a geothermal energy substation in its basement.