Forum quick links
V3 project Minimum Indoor Air Quality Performance Pre-requisite.
CI-2009 IEQp1:Minimum IAQ Performanceposted by sajjad Malik on
I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option
Prelim and Final Submission Timelines
posted by Amy Harmon on
What are the expected prelim and final submission timeline for both design and construction credits by USGBC?
Different work week lengths
EBOM-v4 LTc1:Alternative transportationposted by Claire Bannister on
Our facility has office staff who work Monday-Friday, and production staff who work Monday-Thursday...
WELL Building Standard query for Images
posted by Nirwair Singh Bajwa on
Hi LEEDuser, My name is Nirwair (Student, University of Alberta) and I am looking at a WELL feasibility for one project. Thanks for my inquiries before and I appreciate prompt replies.
FSC calculations - weight or volume?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Julie Hardy on
Good afternoon everyone, We are wondering if the FSC contribution should be calculated, as in LEED 2009, by volume or weight for products.
Do individual storage facilities count as long-term storage?
Mid-Rise-v4 LTc2:Site selectionposted by Tim Nabholz on
I have a project that has 69 dwelling units and provides indoor bicycle storage for 39 bikes. The project also includes storage lockers in the underground garage for each unit.
Parking Ventilation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Praveenbabu Rajkumar on
We are working on IT/ITES project with above grade parking floors which are naturally ventilated.
Ireland Climate Zone
NC-v4 EAp2:Minimum energy performanceposted by James Duggan on
Hi all, Could anyone clarify if Ireland is in climate zone 5A or 5C? Thanks in advance
Ireland Climate Zone
CS-v4 EAp2:Minimum energy performanceposted by James Duggan on
Hi all, Is Ireland Climate Zone 5A or 5C?
Lighting Levels
CI-v4 EQc6:Interior lightingposted by Kristopher Croghan on
For the three levels of lighting, what about an overhead light, and a task light. Technically that is three different levels when both the task and overhead lights are on. Thoughts?