Forum quick links
Minimum Indoor Air Quality Performance Calculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Amal Venugopal on
My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,
VOC emissions certificate
NC-v4 EQc2:Low emitting materialsposted by Charline SEYTIER on
We received a LEED approved certificate concerning VOC emissions for Polyethylen Foam products.
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
EAc1 Space Cooling and Heating
NC-2009 EAc1:Optimize Energy Performanceposted by Mark Rawson on
Hello, When I generate the EAc1 Summary Report in HAP I have a negative percent savings in space cooling and heating in the performance rating table.
Option 3 - strategy 2
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
MRpc102-Legal Wood
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kristopher Croghan on
So in doing some research, are the following certifications acceptable for the legal wood pilot credit?
Which rating system to use
CI-v4 INc2:LEED Accredited Professionalposted by Pamela Smith on
Major renovation of a 3 story office building in a historic district. Basically zero lot line, cannot change the exterior, pooled parking with neighboring buildings. Select for BDC or IDC?
Option 1 Workforce Development Training
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Summer Minchew on
I have a project that has entered in to a Project Labor Agreement including the following: 1) Small, Local Disadvantaged Business Development Assistance, 2) First Source Employment Agreement (defin