Forum quick links
Baseline Energy Rates for CHP
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
I am working on a project where natural gas generator is used power generation and the waste heat is recovered to run the VAM chiller.
Extent of European ACP application
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
I am not quite sure on the wording regarding natural ventilation and the Europe ACP. The online Ref.Guide states "Projects in Europe may use Arbeitsstaettenrichtlinie ASR 5 as a local equivalent to
C&S or EBOM
posted by Patrice McVeigh on
Hi, I have a project which is considered an extension to an existing building. I was originally going to progress under V4 C&S certification as an extension.
Rainwater management - Filters
NC-v4 SSc4:Rainwater managementposted by Jorge Mato Rial on
Hello Everyone! I am working in a project, which includes the following types of surfaces: -Impervious roof areas -Garden areas -Impervious vehicle circulation areas -Parking area with green paveme
Car sharing programs for residential
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Kristen Magnuson on
Does anyone know if cars from car sharing programs provided for residents need to be dedicated only to the residents?
ETS Standard Signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Lowella Villanueva on
Hello Everyone, We are currently working on a project that requires LEED certification. In this regards, I am soliciting everyone's support to share me your expertise on LEED.
NC-v4: Rainwater management
NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des
.
NC-2009 EAp2:Minimum Energy Performanceposted by Instra Ingenieros on
Wrong question. please delete this comment Sorry
Garage lighting
NC-v4 SSc6:Light pollution reductionposted by Brightworks Sustainability on
This may be a silly question, but are fixtures attached to the garage considered building-mounted? The garage is separate from our LEED project but within the site boundary.
Proposed design modelling
NC-2009 PIf3:Occupant and Usage Dataposted by Sivarajah Ragulakeethan on
Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design.