Forum quick links
Minimum Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Alexandra Mazzoni on
Hello, I have a question regarding equivalent standards : Is there an USGBC approved equivalent standard for projects located in France ? Many thanks in advance for your assistance.
Manufacturing Location to Distance Jobsite
CI-2009 MRc5:Regional Materialsposted by Hope Peg on
Hi Everyone!! I need help- please.. National Gypsum Sheathing is manufactured in Mount Holly North Carolina and my Project is located In Silver Spring , Maryland .
Dist. Center - Light polution
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Antonio Macedo Filho on
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?
Exterior Waterproofing Product, foundations and footings
Healthcare-v4 EQc2:Low emitting materialsposted by LEED Pro Consultant on
Do waterproofing products applied to foundations and/or footings require to comply with VOC thresholds and general emissions evaluation?
Cx - Warranty Review After Building is Sold
NC-2009 EAc3:Enhanced Commissioningposted by Andy Smith on
We completed fundamental and enhanced Cx for a building in August of 2016 (with the exception of 10 month warranty review).
LEEDv4- Schools, LTc6 Bicycle Facilities
NC-v4 LTc6:Bicycle facilitiesposted by Karly Michalowski on
I have a LEEDv4 for Schools project where all students, staff and facility live on campus. Would dormitory showers count towards this credit?
Alternative Compliance Path - C&S LEED Threshold reduction
CS-v4 EAp2:Minimum energy performanceposted by MKK LEED on
Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?
Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ed Kokosa on
I've seen previous versions of this question on the forum and the typical answer is to look at design information provided by diffuser manufacturers. As others have replied back, the standard is to
Site Fill as Regional/Recycled Material...
CS-2009 MRc4:Recycled Contentposted by Rick Alfandre on
Looking to confirm: We are using subgrade Fill for our building project that was procured from an on-site location.
Regularly Occupied Spaces Consistency Across All Credits
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Summer Minchew on
We provided a sample floor plan of future tenant area to document this credit.