Tenant Area Modeling
CS-v4 EAp2:Minimum energy performanceposted by Aaron Luthien on
Hello all, We have a C&S office project where the owner prepares technical infrastructure for VRF heating cooling system in tenant area.
Translucent Glazing Film
NC-v4 EQc2:Low emitting materialsposted by Eric White on
Our project is using a translucent film on several demountable glass office partitions to provide screening and privacy.
Baseline HVAC schedules
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
The project will apply for certification under LEED v2009 NC. The Proposed design is a 50,000 sf three story building (two above ground plus a full basement) with a central atrium.
SSc4.2 in Multi-residential building
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Yan-Chuan Chen on
Hi all, We are working on a residential building. The quantity of resident should use the architect's calculation which based on OBC or put the number which based on the LEED reference guide?
Wool/Biobased material
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Peter Harenda on
I am trying to clarify if 100% wool design felt would classify as a bio-based material for option 2. The portion on skin is where the question arises. Thank you.
non-irrigation credit
NC-v4 WEc2:Indoor water use reductionposted by henry nguyen on
Hello. If my project will have no water use for permanent irrigation sys after 2 yrs threshold and it has used of native plants, I wd instantly qualified for 2p, given this is a Rqmt and ALSO a cre
Retail project
EBOM-v4 LTc1:Alternative transportationposted by Charalampos Giannikopoulos on
Should customers of a large retail building selling large items (and hence requiring customers to arrive by car and carry items purchased) be included in the calculations? Thanks!
Project space Owned & Leased partly
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Nandana Kumar on
Hi I have a project where out of the total project area, the owner owns 75% of the project spaces and remaining 25% is leased (lease period 3 years).
Locker rooms
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Agnieszka Rylska on
Are CO2 sensors required in locker rooms? Loker rooms are non-regularly occupied spaces but they are also densely-occupied spaces.
EQUIVALENCE WITH VERSION 2009
CI-v4 EQc7:Daylightposted by Gabriela Mena on
Hi, We have a CI project that is in a CS Platinum V3 building, the building achieved the IEQ C8.1 for the Core & Shell under Option 1.