Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tenant Area Modeling

CS-v4 EAp2:Minimum energy performance
posted by  Aaron Luthien  on 

Hello all, We have a C&S office project where the owner prepares technical infrastructure for VRF heating cooling system in tenant area.

1
Fri May 5, 2017, 1:45 pm

Translucent Glazing Film

NC-v4 EQc2:Low emitting materials
posted by  Eric White  on 

Our project is using a translucent film on several demountable glass office partitions to provide screening and privacy.

1
Fri May 5, 2017, 3:52 pm

Baseline HVAC schedules

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

The project will apply for certification under LEED v2009 NC. The Proposed design is a 50,000 sf three story building (two above ground plus a full basement) with a central atrium.

1
Mon May 8, 2017, 2:23 pm

SSc4.2 in Multi-residential building

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Yan-Chuan Chen  on 

Hi all, We are working on a residential building. The quantity of resident should use the architect's calculation which based on OBC or put the number which based on the LEED reference guide?

1
Sat Aug 26, 2017, 11:13 pm

Wool/Biobased material

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Peter Harenda  on 

I am trying to clarify if 100% wool design felt would classify as a bio-based material for option 2. The portion on skin is where the question arises. Thank you.

1
Fri Jun 9, 2017, 11:04 am

non-irrigation credit

NC-v4 WEc2:Indoor water use reduction
posted by  henry nguyen  on 

Hello. If my project will have no water use for permanent irrigation sys after 2 yrs threshold and it has used of native plants, I wd instantly qualified for 2p, given this is a Rqmt and ALSO a cre

1
Fri Jun 9, 2017, 1:48 pm

Retail project

EBOM-v4 LTc1:Alternative transportation
posted by  Charalampos Giannikopoulos  on 

Should customers of a large retail building selling large items (and hence requiring customers to arrive by car and carry items purchased) be included in the calculations? Thanks!

1
Tue Jun 6, 2017, 12:08 am

Project space Owned & Leased partly

CI-2009 MRc1.1:Tenant Space—Long-Term Commitment
posted by  Nandana Kumar  on 

Hi I have a project where out of the total project area, the owner owns 75% of the project spaces and remaining 25% is leased (lease period 3 years).

1
Sat Aug 26, 2017, 10:36 pm

Locker rooms

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Agnieszka Rylska  on 

Are CO2 sensors required in locker rooms? Loker rooms are non-regularly occupied spaces but they are also densely-occupied spaces.

1
Mon May 8, 2017, 1:12 pm

EQUIVALENCE WITH VERSION 2009

CI-v4 EQc7:Daylight
posted by  Gabriela Mena   on 

Hi, We have a CI project that is in a CS Platinum V3 building, the building achieved the IEQ C8.1 for the Core & Shell under Option 1.

1
Tue May 9, 2017, 12:44 pm