Onsite solar PV generation - 10 years contract
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Ameet AA on
Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?
GREEN POWER - WIND Mills
NC-2009 EAc6:Green powerposted by SAMY Chamy on
Dear Concern:- Our client produce huge amount of Renewable energy by wind mills and the energy produced via wind mill is almost 5 times greater than LEED project annual energy consumption so pl
WEp1 Form V01
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Melissa Merryweather on
Hi, I have form V01 for WEp1, and I can't find any information to say that this form has been updated (V01 is the only one listed on USGBC forms source), but there was a reference somewhere to an u
Water Pressure to Fixtures
CS-v4 WEp2:Indoor water use reductionposted by Ciaran McCabe on
Is it an absolute requirement that the proposed pressure (in PSI) matches the baseline. Can we use a flow rate at a lower pressure to avoid excessive pump sizes ?
Samples from Stopwaste.org
EBOM-v4 EQc4:Interior lightingposted by Alexa Stone on
Can someone please send me the pdf sample from StopWaste.org? I can't open it from here. Thanks! Alexa www.ecopreserve.net
40 CFR 59, Subpart D (EPA Method 24)
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Deborah Lucking on
We have a traffic coating product that has VOC below 350g/L, and is compliant with 40 CFR 59, Subpart D (EPA Method 24).
simple box model
NC-v4 IPc1:Integrative processposted by Courtney Royal on
how do you define a simple box model? for example, do you need to model thermal zones, etc.
TI scope vs. CS base building
CI-v4 EQc9:Acoustic performanceposted by Michelle Rosenberger on
How do we achieve this credit based only on TI scope of work?
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
Municipality Managed System
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Chen Shalita on
Hello, For our project we are interested in checking the feasibility of control measures outside the LEED project boundary. The municipality where the project is located has a stormwater managem