Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Which parameters of the cooling tower?

NC-v4 WEc3:Cooling tower water use
posted by  Jade Deltour  on 

Which parameters/performances of the cooling tower need to be checked/optimised to limit tower cycles to avoid exceeding maximum values?

0

Maximum Number of Cycles

NC-v4 WEc3:Cooling tower water use
posted by  Apoorv Goyal  on 

Hi, based on a water test report, if the number of cycles already exceed 10, does that mean that both points are achievable?

1
Thu Jan 11, 2018, 9:24 pm

Dry cooling tower

NC-v4 WEc3:Cooling tower water use
posted by  Sara Johansson  on 

Hi, If a project has dry cooling, a type of cooling tower, can it than get this point?

1
Thu Jan 11, 2018, 9:13 pm

Campus Cooling Tower

NC-v4 WEc3:Cooling tower water use
posted by  Brightworks Sustainability  on 

My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower.

0

Option 2- "Waste" reduction

NC-v4 MRc5:Construction and demolition waste management
posted by  Whitney Smith  on 

In option 2 of this credit, does the 2.5 pounds of "waste" mean 2.5 pounds of non diverted waste?

1
Tue May 31, 2016, 3:03 pm

Exemplary Performance Over 95% Diverted

NC-v4 MRc5:Construction and demolition waste management
posted by  Cynthia Kaplan  on 

Has this bonus point gone away? There is no longer a point awarded for achieving a diverted rate over 95%?

1
Sun Sep 25, 2016, 3:12 pm

Waste unit conversion

NC-v4 MRc5:Construction and demolition waste management
posted by  Charline SEYTIER  on 

We’re currently working on a project that is following option one for this credit and calculating the waste diversion in weight.

1
Tue Sep 27, 2016, 12:19 am

Construction and Demolition Waste Management - Credit Calculator

CI-v4 MRc6:Construction and demolition waste management
posted by  Dipti Talwar  on 

1. While filling the details in the credit calculator, in the material stream column there is an option of Recycled – source separated. What does this mean?

1
Tue Jan 22, 2019, 3:36 pm

reference book LEED v4 ND is it mistake?

ND-v4 NPDp1:Walkable streets
posted by  natalia rakhmanova  on 

Please any AP ND explain me how they got BH-SC ratios 1:0,6 1:0,86 and 1:1,33 instead of 1:1,66 1:1,16 and 1:0,75 ?

0

Block length

ND-v4 NPDp1:Walkable streets
posted by  Martine Desbois  on 

Hi Elliot, Could you confirm that plaza and pedestrian only paths, being right-of-ways, can be used to define the end of a block length? Thanks

0