Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Outdoor shower?

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Cindy Quinn  on 

Any chance an outdoor shower with curtained off changing area would qualify in a hot, arid climate?

1
Thu Mar 2, 2017, 6:36 pm

Recycled content project's calculation with an average

NC-2009 MRc4:Recycled Content
posted by  cristina algaze beato  on 

Hi. I have two projects were the contractor has given me the recycled content (RC) information of structural metal products. But, the cost of each product has not been itemised.

1
Fri Mar 3, 2017, 4:21 am

Overlapping LEED boundaries-connecting new to existing LEED BLDG

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Punit Jain  on 

I am working on a LEED certification for a new building that is attached via a small circulation bridge to an existing LEED-Certified building on a college campus.

0

CFS-TTS Firestop Top Track Seal

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Celimar Fournier  on 

We are currently using the Hilti CFS-TTS Firestop Top Track Seal for one of our projects. The VOC Content is 22g/l. Under what category should I enter this product for IEQ c4.1?

1
Fri Mar 3, 2017, 4:21 pm

TPO Roofing

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Celimar Fournier  on 

Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?

1
Fri Mar 3, 2017, 6:06 pm

Controls in individual occupant spaces

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  VEL MUTHU  on 

I am working on a project where i have a control room to monitor the users activities for security purpose. There are 7 seats.

1
Mon Aug 14, 2017, 10:50 pm

EPDs and Manufacturing Dates

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Michelle Rosenberger  on 

Does an EPD need to be issued before the manufacturing date of the product installed? Or do we just need to provide an EPD for that product when we submit for certification?

1
Mon Apr 10, 2017, 2:21 pm

Documenting thermal comfort controllability.

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  VEL MUTHU  on 

I am working on a project where i have retail units in a big building which serves the building users. These retail units will be rented so we are not sure how the seat arrangements are.

1
Mon Aug 28, 2017, 6:50 pm

SRI Non-roof

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  MARIA ESTHER LAMADRID  on 

Hello, does anyone know if it is aceptable to use sri values of concrete from the guide for a crusher fine concrete or it need a test to be accepted? Thanks

1
Sat Aug 26, 2017, 9:53 pm

About disturbance considerations for retention walls.

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Mauricio Ramirez  on 

Hi everyone: I have a Project that needs to have large retention walls close to the office and main acces road.

1
Thu Apr 27, 2017, 5:53 pm