Forum quick links
Outdoor shower?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Cindy Quinn on
Any chance an outdoor shower with curtained off changing area would qualify in a hot, arid climate?
Recycled content project's calculation with an average
NC-2009 MRc4:Recycled Contentposted by cristina algaze beato on
Hi. I have two projects were the contractor has given me the recycled content (RC) information of structural metal products. But, the cost of each product has not been itemised.
Overlapping LEED boundaries-connecting new to existing LEED BLDG
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Punit Jain on
I am working on a LEED certification for a new building that is attached via a small circulation bridge to an existing LEED-Certified building on a college campus.
CFS-TTS Firestop Top Track Seal
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
We are currently using the Hilti CFS-TTS Firestop Top Track Seal for one of our projects. The VOC Content is 22g/l. Under what category should I enter this product for IEQ c4.1?
TPO Roofing
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?
Controls in individual occupant spaces
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by VEL MUTHU on
I am working on a project where i have a control room to monitor the users activities for security purpose. There are 7 seats.
EPDs and Manufacturing Dates
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Michelle Rosenberger on
Does an EPD need to be issued before the manufacturing date of the product installed? Or do we just need to provide an EPD for that product when we submit for certification?
Documenting thermal comfort controllability.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by VEL MUTHU on
I am working on a project where i have retail units in a big building which serves the building users. These retail units will be rented so we are not sure how the seat arrangements are.
SRI Non-roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by MARIA ESTHER LAMADRID on
Hello, does anyone know if it is aceptable to use sri values of concrete from the guide for a crusher fine concrete or it need a test to be accepted? Thanks
About disturbance considerations for retention walls.
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Mauricio Ramirez on
Hi everyone: I have a Project that needs to have large retention walls close to the office and main acces road.