Forum quick links
Converting Inches to volume of rainfall
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Mihir Parikh on
Does anyone have an accurate way of converting total inches of rainfall to cubic feet as required by the credit?
phases of project & VOCs
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Debra a. Lombard on
we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for
LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)
Healthcare-v2009 SSp2:Environmental site assessmentposted by jesmin joseph on
Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.
raw material invoice submital
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Esther Kohout on
I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.
2 Types of Tviz in each window
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
The windows in my project have 2 types of t-viz in each window (above 8'0 is non visible light). How do you document 2 types of tviz in a single room? the excel file doesn't accomodate for that.
Gym is throwing off IEQ credits!
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
We are working on a Recreation Center (Total SF 19,200), the gym is 7,200 and the rest of the building is made up of classrooms and other shared spaces.
Daylighting Simulations
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Joel Jude Tadeo on
For a project that has multiple typical floors and a large area, is it allowable to simulate a typical floor and just multiply the non/daylit areas for documentation?
Help with LEED ND
ND-v4 MPR1:Must be in a permanent location on existing landposted by T J on
Im a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including check
Exterior windows and doors?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?
How to use combination of Option 1 and Option 2?
NC-2009 MRc5:Regional Materialsposted by Erica Downs on
In the FAQ section above, it says "The two options are available to be used on the basis of an individual product or material, so you can mix and match as needed." Does anyone know how to do this?