Forum quick links
Achieving Same Pilot Credit Twice?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Patty Lloyd on
Is it acceptable to attempt the same pilot credit on more than one project? For instance, I achieved PC81 on one project. I was wondering if it is acceptable to attempt it on another project?
Pilot Credit Closed
Pilot-Credits EQpc22:Interior lighting - qualityposted by Laurel Swan on
This Pilot Credit is now listed as closed to new registrations and I do not see it in the Innovation Catalog. Does that mean that this is no longer an option for an Innovation in Design credit?
Latest LEED Online Form
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by AtSite Inc on
The most recent LEED Online form I'm looking at asks for the plan to be uploaded but then only asks you to "Summarize how each operational element was implemented in an environmentally sensitive ma
Replacing filters prior to occupancy
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ashley Love on
We have our preliminary review comments back and had a comment on this credit about the timeline of replacing the filters.
Replacing filters prior to occupancy
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ashley Love on
**I did post this under the IEQc3.1 credit in Schools, too. My project is a school, but I wanted to make sure this question was seen, as my question is not "school only".
Certificates for hot district water?
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Izabela Kwiecinska on
Hello Everyone, We are preparing our Client to buy Green-e certified energy. We don't know if he has to buy also GOs or carbon offsets for district hot water that the building is supplied with.
Adding credits after Construction Decision
posted by Deborah Lucking on
We just received Construction Decision and the client wants to know if we can submit additional credits (to get from LEED Silver to Gold). Has anyone tried this? Any advice? Thanks!
Green pavers
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by jesmin joseph on
Can green/grass pavers comply towards maximum open space credit? Can we consider 25% percentage of grass paver area as vegetated area and other 75% as pedestrian oriented hardscape area? Please a
Consumable Materials for Equipment
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by RYAN BEN SABILALA on
Just want to make sure if the consumable materials like oils, gaskets, O-rings etc.
Flush out by AHU volume or Floor volume?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Aru Sau on
In this project, there are three floors ( with multiple rooms with interior walls with doors) with multiple AHUs serving from 100% OA intake to 20% OA intake.