Dark rooms / film development rooms / etc.

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Heather Holdridge  on 

I'm working on a higher ed art building with dark rooms, photo labs, and film development rooms that are projected to be occupied by one person at a time.

1
Fri Mar 3, 2017, 7:05 pm

MANDATORY REQUIREMENTS AHSRAE 90.1

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jorge Torres-Coto  on 

Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.

1
Thu Jan 26, 2017, 8:44 pm

MANDATORY REQUIREMENTS AHSRAE 90.1

NC-2009 EAp2:Minimum Energy Performance
posted by  Jorge Torres-Coto  on 

Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.

1
Thu Jan 26, 2017, 8:39 am

Carbon Dioxide Monitors

EBOM-v4 EQc2:Enhanced indoor air quality strategies
posted by  sebastian castañeda  on 

I currently have installed co2 sensors in densely occupied rooms located to the specifications mentioned in the OM LEED V4 Ref Guide.

1
Mon Aug 28, 2017, 10:07 pm

EPD Option 2 - Compliance

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Alexa Stone  on 

For Option 2 - How do you determine credit compliance with an industry-wide EPD?

1
Tue Jan 31, 2017, 3:13 pm

Can't find pipe insulation that meets LEED V4 criteria

LEED for Homes (LEED-H) Forum
posted by  Phil Vanderloo  on 

Can someone guide me in to some pipe insulation for 1/2" pex piping that meets the requirements of LEED V4 Homes. Needs to be 1/2" wall thickness, minimum R-4 Everything I can get locally is R3.5,

0

R-4 pipe insulation

Homes-v2008 EAc7:Water heating
posted by  Phil Vanderloo  on 

Does anyone have a recommendation for pipe insulation that meets LEED V4 criteria? Min R-4, 1/2" wall thickness Thank You

0

Option 1 or Option 2

CS-2009 EAc6:Green Power
posted by  Martin Meehan  on 

Hello all, I am working on a Core and Shell project that is targeting Green Power. While we have an energy model for the project, can you confirm if the project MUST use the Option 1?

1
Fri Jan 27, 2017, 2:48 pm

LEED CI MPR for existing land...

CI-v4 MPR1:Must be in a permanent location on existing land
posted by  Keith Robertson  on 

V4 cites the MPR requirement to build on already existing land as a requirement for CI projects. Isn't that a given?

1
Sat Aug 26, 2017, 6:14 pm

Exterior connected lighting power - Enclosed mall

Retail-CI-v2009 EAc1.1:Optimize energy performance - lighting power
posted by  LEED Pro Consultant  on 

We have a retail project located in an enclosed mall. The retail store has some illuminated logos on the entrance and the display window.

1
Sat Aug 26, 2017, 11:45 pm