Dark rooms / film development rooms / etc.
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Heather Holdridge on
I'm working on a higher ed art building with dark rooms, photo labs, and film development rooms that are projected to be occupied by one person at a time.
MANDATORY REQUIREMENTS AHSRAE 90.1
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on
Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.
MANDATORY REQUIREMENTS AHSRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.
Carbon Dioxide Monitors
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by sebastian castañeda on
I currently have installed co2 sensors in densely occupied rooms located to the specifications mentioned in the OM LEED V4 Ref Guide.
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?
Can't find pipe insulation that meets LEED V4 criteria
posted by Phil Vanderloo on
Can someone guide me in to some pipe insulation for 1/2" pex piping that meets the requirements of LEED V4 Homes. Needs to be 1/2" wall thickness, minimum R-4 Everything I can get locally is R3.5,
R-4 pipe insulation
Homes-v2008 EAc7:Water heatingposted by Phil Vanderloo on
Does anyone have a recommendation for pipe insulation that meets LEED V4 criteria? Min R-4, 1/2" wall thickness Thank You
Option 1 or Option 2
CS-2009 EAc6:Green Powerposted by Martin Meehan on
Hello all, I am working on a Core and Shell project that is targeting Green Power. While we have an energy model for the project, can you confirm if the project MUST use the Option 1?
LEED CI MPR for existing land...
CI-v4 MPR1:Must be in a permanent location on existing landposted by Keith Robertson on
V4 cites the MPR requirement to build on already existing land as a requirement for CI projects. Isn't that a given?
Exterior connected lighting power - Enclosed mall
Retail-CI-v2009 EAc1.1:Optimize energy performance - lighting powerposted by LEED Pro Consultant on
We have a retail project located in an enclosed mall. The retail store has some illuminated logos on the entrance and the display window.