Supplementary Cementitious Materials
NC-2009 MRc4:Recycled Contentposted by Shawn Keith on
I have my cement tracker all filled out.
Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%
NC-v4 WEc1:Outdoor water use reductionposted by Jing Zhang on
Outdoor Water Use Reduction Credit Does option 2 means, if reduction ranges from 50% to 100%, then, at least 30% need to be achieved only through plant and irrigation system efficiency.
want to get information about previous LEED certified projects
NC-2009 PIf2:Project Summary Detailsposted by Amir Salehi on
Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,
detail information about LEED certified projects
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Amir Salehi on
Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,
Visitors for residential units
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Hello, Where can I find info on regular and peak visitors for residentual units? App 2 does not give any information on residentual units.
Transients, visitors and peak visitors
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
The LEED manual states that transients = visitors. The credit requirements are percentages based on peak visitors. Appendix 2 in the manual gives defaults on transients (visitors).
Soil Restauration in vegetated roof
NC-v4 SSc2:Site development - protect or restore habitatposted by Ana García on
Dear All, We are working in a project, in which the whole site was previously developed and paved. All new green areas will be vegetated roofs (project achieves a density of 1.5 floor-area ratio).
EPMD Membrane Adhesive
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anna Bak on
In FAQs for IEQc4.2 I found an information that the actual weather barrier does not need to comply with the credit. I understand that we can treat EPMD Membrane as weather barrier.
V4 Advanced Energy Metering Template is Protected
NC-v4 EAc3:Advanced energy meteringposted by Steven Wychorski on
Hello The USGBC approved Data template for Building Energy Metering is locked/protected. It only has 2 meter tabs. My project has 60+ different meters to input.
Sounds transmission - Ceilings and Floors
NC-v4 EQc9:Acoustic performanceposted by Adam Stoker on
The LEED v4 acoustics calculator expands on the guidance provided in the credit and reference guide with respect to the sound transmission requirements and associated calculations.