Forum quick links
Total Water Use Calculator
Homes-v4 WEc1:Total water useposted by Phil Vetterkind on
Is there a off line calculator for "Total Water Use" yet?
ACP using v4 language
CI-2009 EAc3:Measurement and Verificationposted by Brightworks Sustainability on
LI #10418 allows LEED-NC v2009 projects to meeting the M&V credit by meeting LEED v4 enhanced commissioning, monitoring-based commissioning, and the advanced energy metering credit.
Parking ventilation/exhaust
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charalampos Giannikopoulos on
As per ASHRAE 62.1 parking areas are subject to requirements for exhaust air and not ventilation rates. Accordingly, parking areas are not included in IEQp1, are they? Thanks in advance!
Exceptional calculation for process load
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
What would be the process of an exceptional calculation to prove reduction in process office equipment density for an office building?
Thermal Comfort - ACP for Projects in India
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Gopinath Vasu on
Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con
Lighting Control
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by VISHESH AGARWAL on
I am working on the project where whole building have occupancy sensor. does need to install 50% of the multi occupant space have lighting control by dimmer.
Green e energy equivalency EKOenergy
CI-v4 EAc6:Green power and carbon offsetsposted by Valentin Grimaud on
Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.
Enhanced Cx - EAc3;
NC-2009 EAc3:Enhanced Commissioningposted by Miles Britz on
Systems Manual; on our Const. Phase submittal the reviewer stated we need to include a Systems Manual. It appears this refers to the Training of staff on the bldg.'s.
Applying for LEED after the building is finished
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ciaran McCabe on
This is a very general LEED question however is it possible to apply for LEED accreditation for a new building that is finished and handed over to client.
Critical zone
NC-2009 IEQp1:Minimum IAQ Performanceposted by Charalampos Giannikopoulos on
IEQp1 form v06 has a new requirement to describe "how critical zones are selected and how all occupiable zones are accounted for in the determination of the critical zone.