Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Outdoor water use to water mirrors in roof

CS-v4 WEp1:Outdoor water use reduction
posted by  Tobias Berge  on 

Is small water mirrors situated at the roof included in the credit? The architect has planned a few water mirrors close to a sky bar.

1
Tue Jan 17, 2017, 8:10 pm

Slab on grade and concrete piers

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  David Browne  on 

I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.

1
Wed Jan 18, 2017, 4:38 pm

Thermal Comfort Control through BMS

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Gray Bender  on 

Hello, I am looking to understand if it would be acceptable to provide thermal comfort control only through a BMS system for a multi-occupant space.

1
Wed Sep 14, 2016, 8:22 pm

Registration by Owner or Consultant?

NC-2009 PIf2:Project Summary Details
posted by  Vanessa Montezuma Ramos  on 

I am not sure if I am in the correct subject, but I did not find any answer or forum subject regarding this particular matter.

1
Wed Sep 14, 2016, 2:17 am

Reviewer's comment on MPR2

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Eric Bautista  on 

I am handling a new LEED building addition horizontally attached to a non-LEED existing building.

0

Showers?

CS-v4 LTc6:Bicycle facilities
posted by  Sara Johansson  on 

Do the required number showers have to be placed together (near the bicycle racks) or can showers spread through-out the building be accounted for?

1
Tue Sep 20, 2016, 5:57 pm

Combination of Survey/Tracking

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jason Cocek  on 

The building I am working on has a shuttle service that brings employees to work from various city stops as well as local train stations.

1
Thu Oct 6, 2016, 4:44 pm

Table Plf3-2. vs. Table Plf3-3

NC-2009 PIf3:Occupant and Usage Data
posted by  Michael Kennedy  on 

We have renovation of a college building. Most of the building is made up of faculty offices with some waiting areas and conference rooms.

1
Tue Sep 27, 2016, 2:57 pm

Solar Reflectance of Porous Playground Paving Materials

NC-v4 SSc5:Heat island reduction
posted by  Steven Burke  on 

The reference guide does specifically mention that playgrounds are one of the non-roof areas that should receive shading, though after the one line where playgrounds are mentioned in parentheses, t

1
Tue Sep 20, 2016, 4:12 pm

Number of thermal control panel and window needed

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  Cathy W  on 

It is a mechanical ventilated office building. To achieve this credit: 1.

1
Tue Sep 20, 2016, 4:08 pm