Epoxy floor coatings

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Mathilda Jonsson  on 

Hello Does Epoxy floor go under Floor Coatings? It's hard to find epoxy with as low VOC-content as the requirement for floor coatings (100 g/l), tht's why I'm wondering.

1
Tue Aug 9, 2016, 5:07 pm

Low Emitting Materials -Pushing the Industry forward to meet v.4

CI-v4 INc1:Innovation
posted by  Kerry Honsinger  on 

We are working on a LEED v.4 project. Regarding EQ Credit, Low Emitting Materials....

1
Tue Aug 9, 2016, 3:34 pm

MRpc69 Attainable in the New Construction Project

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Vanessa Cardona  on 

This credit was readily attainable for a new residential building located in Manhattan. Six streams were recycled by tracking waste throughout the construction phase of the project.

0

ID credit Green Cleaning Policy without walk-off mats

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Rachel Bannon-Godfrey  on 

We have a project that is not achieving IEQc5 as walk-off mats conflict with the operational aspects of the building. Can we still apply for an ID credit for a green cleaning policy?

1
Thu Aug 4, 2016, 10:30 am

SSc6.1 Design Storm Interval

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Curtis Dorosh  on 

Hi, I have noticed this question 2 times in the comments, but, I don't see an answer.

1
Thu Aug 18, 2016, 3:32 pm

IEQc4.5 Uncertified Furnishings

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Emily Neal  on 

Hello, I'm a little confused with this credit. I've entered all the information that I have for the systems furniture that is Greenguard or ANSI certified. I have one piece that is not certified.

1
Tue Aug 9, 2016, 5:57 pm

Determining Site Boundary on Renovations/Additions

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Andrew Buck  on 

We are working on a Hotel that is both a renovation and major new construction.

1
Tue Aug 9, 2016, 5:58 pm

All controls provided using customised mobile app

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Yusuf Turab  on 

We are working on an IT office building that does not have any switches to control lighting.

1
Wed Jan 18, 2017, 1:02 am