LEED Rating System for tenant in existing building

LEED Rating System Selection
posted by  Jennifer Isaac  on 

My client is a pharmaceutical facility that occupies part of the area of an existing building.

0

Reject Water from Reverse Osmosis system?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Eric Bautista  on 

Dear Fellow LEED Users, In the Irrigation Design Case tabulation, can I declare "reject water" from reverse osmosis equipment system of campus, as the source of non-potable water? Thanks in advan

0

DES Rates

General forums
posted by  Valentin Grimaud  on 

We are working an a project about a building using purchased hot water and purchased chilled water from DES.

1
Tue Jun 21, 2016, 2:21 pm

IAQ management plan-during construction or before occupancy

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Kali Wolin  on 

I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.

1
Fri Jun 17, 2016, 12:42 am

LEED Pilot Credit 30

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  S. Sachs  on 

We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi

1
Tue Jun 28, 2016, 8:14 pm

V4 EBOM - Commissioning

EBOM-v4 EAc2:Existing building commissioning - implementation
posted by  Meier Corporate Account  on 

Good Afternoon, Our manufacturing plant was constructed in 2014-2015 and went online in August of 2015.

1
Mon Jun 20, 2016, 9:47 pm

What are the baseline conditions?

EBOM-v4 SSc5:Site management
posted by  Zachary Hayes  on 

This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?

0

Modeling Procedure for ERV,HRW,Treated Fresh Air Units

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All we have model the factory project with 50% A/c and 50% Ventilation and the fresh air is supplied by ERV, HRW, Treated fresh air units to A/c areas but the ERV, HRW, Treated fresh air unit

1
Fri Jun 17, 2016, 1:02 pm

HVAC modelling for Tenant Occupied Spaces

CS-2009 EAp2:Minimum Energy Performance
posted by  Saumendra Aggrawal  on 

I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.

1
Sun Jun 19, 2016, 8:52 pm

Thermal Comfort - Adaptive Method

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  SAMY Chamy  on 

Dear All we are using (http://smap.cbe.berkeley.edu/comforttool) this link for thermal comfort results but we use PMV method for A/c areas and Adaptive method for ventilated areas (due to lack of

0