Forum quick links
LEED Rating System for tenant in existing building
posted by Jennifer Isaac on
My client is a pharmaceutical facility that occupies part of the area of an existing building.
Reject Water from Reverse Osmosis system?
NC-2009 WEc1:Water Efficient Landscapingposted by Eric Bautista on
Dear Fellow LEED Users, In the Irrigation Design Case tabulation, can I declare "reject water" from reverse osmosis equipment system of campus, as the source of non-potable water? Thanks in advan
DES Rates
posted by Valentin Grimaud on
We are working an a project about a building using purchased hot water and purchased chilled water from DES.
IAQ management plan-during construction or before occupancy
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Kali Wolin on
I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.
LEED Pilot Credit 30
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by S. Sachs on
We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi
V4 EBOM - Commissioning
EBOM-v4 EAc2:Existing building commissioning - implementationposted by Meier Corporate Account on
Good Afternoon, Our manufacturing plant was constructed in 2014-2015 and went online in August of 2015.
What are the baseline conditions?
EBOM-v4 SSc5:Site managementposted by Zachary Hayes on
This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?
Modeling Procedure for ERV,HRW,Treated Fresh Air Units
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All we have model the factory project with 50% A/c and 50% Ventilation and the fresh air is supplied by ERV, HRW, Treated fresh air units to A/c areas but the ERV, HRW, Treated fresh air unit
HVAC modelling for Tenant Occupied Spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Saumendra Aggrawal on
I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.
Thermal Comfort - Adaptive Method
NC-2009 IEQc7.1:Thermal Comfort—Designposted by SAMY Chamy on
Dear All we are using (http://smap.cbe.berkeley.edu/comforttool) this link for thermal comfort results but we use PMV method for A/c areas and Adaptive method for ventilated areas (due to lack of