Forum quick links
Integrity of information under Development Density Option
NC-2009 SSc2:Development Density and Community Connectivityposted by Eric Bautista on
Hello Fellow LEEDUsers, I am about to submit LEED docs for preliminary review. I just want to ask if we are using Option 1 Development Density, how can we prove the integrity and accuracy of nume
Replace All Filtration Media
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Ran Zhang on
Hi I am working on a project located in Tokyo Japan. We are aiming to pursue IEQ c1.5 and thinking about the requirements regarding the filtration media replacement right now.
Staggered Vegetated Areas
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Martin Meehan on
Hello, Our project contains vegetated areas which are located in staggered locations within the LEED boundary.
40% WWR does it include the wall connected to other building?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
90.1 only says above grade wall, but if we have a wall that's directed connected to another building, should we also include those wall area in the calculation?
40% WWR does it include the wall connected to other building?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I wonder if the wall is directly connected to adjacent building ,should we include them in the window to wall calculation?
Process Water Reduction
Schools-2009 WEc2:Innovative Wastewater Technologiesposted by Charles Shinneman on
Can this credit be used for process water reduction? Washing machines for example.
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced Commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
O+M: Retail or ID+C: CI
posted by Yulia Chen on
Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.
Additional Points for Water Reuse
NC-v4 WEc2:Indoor water use reductionposted by Soo Choi on
I am working on a project that has a vehicle wash bay where they intend to recycle the water and use it multiple times for washing before discharging to sewer.
Base Case vs Project Case
CS-2009 EAp2:Minimum Energy Performanceposted by Dana Guzman on
Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2?