Integrity of information under Development Density Option

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Eric Bautista  on 

Hello Fellow LEEDUsers, I am about to submit LEED docs for preliminary review. I just want to ask if we are using Option 1 Development Density, how can we prove the integrity and accuracy of nume

1
Fri Aug 12, 2016, 5:31 pm

Replace All Filtration Media

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Ran Zhang  on 

Hi I am working on a project located in Tokyo Japan. We are aiming to pursue IEQ c1.5 and thinking about the requirements regarding the filtration media replacement right now.

1
Tue Jun 14, 2016, 7:02 pm

Staggered Vegetated Areas

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Martin Meehan  on 

Hello, Our project contains vegetated areas which are located in staggered locations within the LEED boundary.

1
Thu Jan 19, 2017, 2:06 pm

40% WWR does it include the wall connected to other building?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

90.1 only says above grade wall, but if we have a wall that's directed connected to another building, should we also include those wall area in the calculation?

0

40% WWR does it include the wall connected to other building?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I wonder if the wall is directly connected to adjacent building ,should we include them in the window to wall calculation?

1
Tue Jun 14, 2016, 2:01 pm

Process Water Reduction

Schools-2009 WEc2:Innovative Wastewater Technologies
posted by  Charles Shinneman  on 

Can this credit be used for process water reduction? Washing machines for example.

1
Sun Aug 27, 2017, 12:13 am

Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?

CI-2009 EAc2:Enhanced Commissioning
posted by  Margaret Montgomery  on 

In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?

1
Tue Jun 14, 2016, 9:49 pm

O+M: Retail or ID+C: CI

LEED Rating System Selection
posted by  Yulia Chen  on 

Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.

0

Additional Points for Water Reuse

NC-v4 WEc2:Indoor water use reduction
posted by  Soo Choi  on 

I am working on a project that has a vehicle wash bay where they intend to recycle the water and use it multiple times for washing before discharging to sewer.

1
Tue Mar 19, 2019, 5:45 pm

Base Case vs Project Case

CS-2009 EAp2:Minimum Energy Performance
posted by  Dana Guzman  on 

Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2?

0