Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

choosing between CS and Hospitality

LEED Rating System Selection
posted by  GBD Architects  on 

Hi, we have a large project coming up that will be about 43% hotel and the rest CS.

1
Sun Apr 10, 2016, 12:16 pm

LEED Selection - High Rise Residential

LEED Rating System Selection
posted by  Curt Pascoe  on 

I am working on a unique project. 30 story existing historic building, office.

1
Wed Mar 30, 2016, 1:08 pm

Occupancy Sensors and 9.4.1.1

NC-2009 EAp2:Minimum Energy Performance
posted by  Curt Pascoe  on 

We are looking at a high rise residential project, to be NCV2009. Our electrician is stating all hallways need occupancy sensors.

1
Fri Feb 12, 2016, 10:07 pm

Defining landscaped areas

NC-2009 WEc1:Water Efficient Landscaping
posted by  Veronika Kozlova  on 

Dear all, Our project has a landscaped area that includes trees, shrubs and grass.

0

Retail Refrigeration

Retail-NC-v4 EAp4:Fundamental refrigerant management
posted by  Jason Smith  on 

I am currently working on a new retail construction project and would like to know if we should include the chilled drink cabinets (fizzy drinks, Milk etc.) within the Fundamental Refrigeration Cal

1
Thu Mar 3, 2016, 8:48 pm

LEED Boundary and Non-contiguous reconfigured areas

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aaron Ketner  on 

Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.

0

EBOM Solid Waste Management Policy in Medical Office Building

NC-2009 IDc1:Innovation in Design
posted by  Sara Goenner Curlee  on 

My project is pursuing LEED NC, and was hoping to use MRp2 as an innovation credit.

1
Mon Mar 13, 2017, 5:31 pm

Waste Management

NC-2009 MRc2:Construction Waste Management
posted by  Ali Scander  on 

Hello, I'm concerned about our project earning points for MRc2.

1
Tue Feb 16, 2016, 9:30 pm

Two Identical Buildings

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Paula Hernandez  on 

Hi, we want to achieve the Precertification for a CS project. There are two office buildings, almost identical, on the same parcel. They share four underground parking levels.

0

Baseline Economizers

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Paula Hernandez  on 

Standard ASHRAE 90.1-2010 states that Outdoor air exonomizers shall be included in baseline HVAC systems 3 trhough 8, with the exception 6.5.1d: Systems that include a condenser heat recovery syste

0