Very old CI 2009 registered project - can we still certify?
CI-2009 PIf1:Minimum Program Requirementsposted by Eric Thompson on
Hi I'm helping a colleague who has a project that was registered in 2011 for LEED CI 2009 and construction completed / substantial completion in 2011.
VRP Compliance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Regarding VRP Compliance Calculator (IEQp1), there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several
Tools and flexibility
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Devani PERERA on
There are secral tools that can be used for LCA but it appears that some tools are more detailed than others. In europe the calculation methods seems to go into great detail.
LEED V3 2009 SSc3- Asbestos contamination
posted by Patrice McVeigh on
I have a project where two forms of asbestos contamination has been identified. One on pipework and the other in the existing floor slab adhesive - SSc3 Brownfield development.
Modified rational method - rainfall intensity
NC-v4 SSc4:Rainwater managementposted by Hana Raitrova on
Dear All, I´m still wondering how to get a value of rainfall intesity in inches/hour or mm/hour for the 95th percentile (option 2 - modified rathional method) based on time concentration.
Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required to have b
SSpc14 Walkable Project Sites - navigating process
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
Wow. The credit makes some sense, but the process is definitely a challenge. I just spent 20 minutes trying to find the survey to complete it.
LEED CI for Retail - MRp1
Retail-CI-v2009 MRp1:Storage and collection of recyclablesposted by Gail Napell on
does anyone have an example of a waste stream study that meets these requirements? there isn't one in the LEED Reference Guide. thanks all!
when we register a pilot credit....
Pilot-Credits EApc65:Monitoring based commissioningposted by Gail Napell on
we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance -
Option 3 Guidance Now Available!
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Paula Melton on
The actual points won't be achievable for a few months, but USGBC has released implmentation guidance. Please see the details here: