is a BMS necessary?
NC-2009 EAc5:Measurement and Verificationposted by Alfonzo Collins on
The building we’re for which considering M&V will have 14 submetered apartments (which includes the condensing unit for each), as well as a house meter, for electricity (gas will be on one main
Material reuse calculation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jen Roberts on
The second example on pg 536 of the reference guide is a bit confusing.
Water Use Reduction Calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.
Aquifer for cooling
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Erik Nordlund on
I have a project where the project team are planning to partly cool the building using an aquifer.
VOC Meters
posted by Johanna Hendricks on
Has anyone purchased a meter for the annual VOC testing? If so, can you tell me the make/model information and if it worked well? Thanks for any help!
EQ PC 57 - French feedback
CS-2009 IDc1:Innovation in Designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. For this project, LEED CS V3 and French "HQE" (High Env
Withered grass
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.
Substituting v2009 RP category for v4
NC-2009 RPc1:Regional Priorityposted by Miriam Ramirez Baumgarten on
Hi! My project is a LEED NCv2009, I would like to know if it is possible to substitute the complete Regional Priority v2009 category for the Regional Priority v4 category? Thanks! Miriam
Calculating Ds for LEED 62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by William Beechinor on
Hello, I am currently trying to calculated Ds for the cooling condition for a project I an working on.
Air cleaning for IEQc3.1 Construction IAQ management plan
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Marina Radchenko on
We are going to apply for 1 point in credit IEQc3.1 but the Contractor is trying to avoid any ventilation during construction: - no natural ventilation - no ventilation by permanent system - no any