Is touch-up paint exempt?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Erin Holdenried on
This LEED Interpretation states that touch-up paint consists of small unanticipated quantities that can't be controlled by specifications, and therefore is exempt from the credit.
LEED NC v2009: Innovation Design
NC-2009 MRc2:Construction Waste Managementposted by Paola Medina on
Batteries from other company could be encapsulated with concrete in the fund elevators instead of send to landfills?
Credit compliance using AVR as an alternative metric
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Zane Lichtneger on
I see some formal programs use “average vehicle ridership” (AVR) as an alternate metric. We are active participants with the Go Smart/Go Perks/Triangle Transit/Share The Ride program.
Leed boundary for commercial interior
CI-2009 PIf1:Minimum Program Requirementsposted by Elena Gonzi on
Hi, I have some question about LEED Commercial Interior certification : 1) Situation: we have a offices building that has a basement in common with other two offices buildings.
Recycling Batteries
NC-2009 MRc2:Construction Waste Managementposted by Paola Medina on
One of our environmental companies have a lot of batteries that they want to recycle in our LEED project instead of send to landfills through encapsulate with concrete in the background hole of ele
Mandatory requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.
LOCAL PLASTER COMPLIANCE PRODUCT
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by MARIA FERNANDA CORREA MENDIVELSO on
HI... How is the way for document compliance for a local product made with plaster and Shintech PVC Resin wich is used before apply final paint. Thanks
IEQp1 Reductions in supply air flows due to occupant adjustments
CI-2009 IEQp1:Minimum IAQ Performanceposted by Olga Yuil on
We have a Commercial Interior Project with underfloor air distribution (UFAD) system designed to include adjustable supply air diffusers in the floor, which can be used to adjust the amount of supp
LEED v4 BD+C - Core and Shell : Renewable energy production
CS-v4 EAc5:Renewable energy productionposted by Spyridon Kostopoulos on
Can anyone clarify for me please if for a Core and Shell certification, the total building energy costs would pertain only to those building installations which the developer controls and not those
Prescriptive method
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Emmanuel Pauwels on
Can we use the prescriptive method if there is a fixed exterior brise soleil in the façade? Can we use the 63 angle from the brise soleil to exclude part of the daylight area?