How FINAL is the Appeal?

General forums
posted by  Mary Kay  on 

EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then?

0

Existing Central Plant and New building

NC-2009 EAp2:Minimum Energy Performance
posted by  Mital Patel  on 

We have a new building but with existing central plant that serves also another building. My question is do i have to model part of existing central or whole.

1
Wed Jul 8, 2015, 2:32 pm

Green Cleaning in a Fab

NC-2009 IDc1:Innovation in Design
posted by  David Gibney  on 

I'm working on a semiconductor fab that is part of a LEED campus project. The campus has a well-established, campus-wide green cleaning program in place.

1
Fri Nov 27, 2015, 9:11 pm

No irrigation for pre-req

NC-v4 WEp1:Outdoor water use reduction
posted by  Robyn Dowsey  on 

I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true

1
Thu Aug 27, 2015, 8:37 pm

Mixed-use Building

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Wan Ji Loo  on 

Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.

1
Mon Nov 30, 2015, 10:34 pm

"Preserve from development activity 40% of the greenfield area"

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Natalie Otoole  on 

Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.

1
Fri Jul 31, 2015, 1:20 am

Apparatus bay of Fire Department

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Laura Charlier  on 

HI there, Would the apparatus bay of a fire department need to be included in the building flush-out? I see a typical garage would not need to be included but this isn't a typical garage.

1
Fri Jul 10, 2015, 12:36 am

is a tenant lease agreement applicable here?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Alfonzo Collins  on 

I am working on a C&S office building, and I'm reading differing viewpoints on this credit and IEQc8.2. Must these credits be included in the Tenant Lease agreement?

1
Fri Jul 10, 2015, 2:32 pm

Conveying systems now accepted for this credit

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Paula Melton  on 

A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who

0