Forum quick links
CI: ID+C Project: Innovation in Design Credit
CI-2009 IDc1:Innovation in Designposted by Bridgett Weaver on
For an CI: ID+C Project Can you can earn / achieve innovation in design credit for following BD+C Enhanced Refrigerant protocols in CI project?
Credit Union
CI-2009 SSc2:Development Density and Community Connectivityposted by Neil Rosen on
Would a credit union work as a basic service in place of a bank?
<500 Miles
NC-2009 MRc5:Regional Materialsposted by Erika Duran on
Sometimes I receive a letter from a manufacturer stating that a material is harvested and manufactured within 500 miles of the project site however for proprietary reasons, they cannot disclose the
Needed Upload
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Omar Elrawy on
Dear all, I've got the following note during my preliminary design review: "2. Several spaces have not been included on the form (....).
Actual Occupancy: LEED Online Forum
CS-2009 PIf3:Occupant and Usage Dataposted by Ian McCall on
Hello, I am would like to enerty the "Actual Building Occupancy" in the forum PIF3 as the actual building occupancy for the LEED building is available.
Exemplary Performance - Unobstructed View
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Erin Holdenried on
I am having a hard time understanding the criteria for "unobstructed view". Does it have to do with interior space layout and the depth of the space in relation to the exterior window? Thanks
Upload IEQc3.2-1. Provide the IAQ Management Plan...
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Zach Hoffman on
Hello, I have been successfully completing IAQ Testing under Option 2 for a few years now and always wondered about this section of the credit template.
AstroTurf
EBOM-2009 WEc3:Water Efficient Landscapingposted by Alexis Voeltner on
What is LEED's stance on AstroTurf? I have a building that replaced all of their grass with this and am curious if it is now considered hardscape.
Bank-Financial Institution
NC-2009 PIf3:Occupant and Usage Dataposted by Joseph Blanco on
How would I calculate transit occupancy for a bank. They have 13 FTE.
LEED V3 2009 - PIf3 occupancy question
NC-2009 PIf3:Occupant and Usage Dataposted by Greg Frankenfeld on
Working on a 5-story residence hall for university client. The top 4 floors are typical bedroom units, with typical support spaces such as study rooms, lounges, etc.