Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Access to Const credits while under Design Review?

General forums
posted by  Renee Shirey  on 

In this updated format of LEED v3, can you access and upload information into Construction credits while a Design review is going on?

0

Reused area of column and beam

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Zhantong Chen  on 

In MR c1.1, how to calculate the column and beam area?

1
Wed Mar 25, 2015, 9:57 pm

no new parking, but how to use local zoning for off-site park?

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Courtney Royal  on 

there will be no new parking in our LEED boundary, but we'll be allocating a few spots in the neighboring parking lot for the use of our building.

1
Tue Feb 17, 2015, 2:37 am

treat rainwater?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Courtney Royal  on 

area you required to treat harvested rainwater when using to flush toilets? if yes, what does "treated" mean exactly, what level of treated would be required? Thanks!

0

MODEL PROTOCOL

NC-2009 EAp2:Minimum Energy Performance
posted by  RICARDO GUEMEZ  on 

Hello, My name is Ricardo from Mexico City.

1
Thu Jan 8, 2015, 2:02 pm

VAV boxes

CS-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.

1
Thu Jan 8, 2015, 2:16 pm

Master site credits

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  charles bell  on 

We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.

0

Option 1 and Option 2?

NC-v4 SSc5:Heat island reduction
posted by  Jonathan Weiss  on 

For a project where we're pushing for parking garages for the cars, but have asphalt driveways, can we consider the footprint of the garage as hardscape that meets the requirement?

1
Thu Apr 16, 2015, 9:47 pm

Area of Balconies?

NC-2009 PIf2:Project Summary Details
posted by  Carrie Laurendine  on 

Im sure this is addressed somewhere but my apologies I haven't found this info. When summarizing building square footage for PIf2, do outdoor balconies (of upper floors) need to be included?

0

Submetering dashboard

CI-2009 EAc3:Measurement and Verification
posted by  Leticia SooHoo  on 

Hello, we are doing a LEED CI project for a large tenant occupying multiple floors. We will pursue Case 1 (less than 75% of area) - submetering.

0