Access to Const credits while under Design Review?
posted by Renee Shirey on
In this updated format of LEED v3, can you access and upload information into Construction credits while a Design review is going on?
Reused area of column and beam
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Zhantong Chen on
In MR c1.1, how to calculate the column and beam area?
no new parking, but how to use local zoning for off-site park?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Courtney Royal on
there will be no new parking in our LEED boundary, but we'll be allocating a few spots in the neighboring parking lot for the use of our building.
treat rainwater?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Courtney Royal on
area you required to treat harvested rainwater when using to flush toilets? if yes, what does "treated" mean exactly, what level of treated would be required? Thanks!
MODEL PROTOCOL
NC-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ on
Hello, My name is Ricardo from Mexico City.
VAV boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
Master site credits
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by charles bell on
We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.
Option 1 and Option 2?
NC-v4 SSc5:Heat island reductionposted by Jonathan Weiss on
For a project where we're pushing for parking garages for the cars, but have asphalt driveways, can we consider the footprint of the garage as hardscape that meets the requirement?
Area of Balconies?
NC-2009 PIf2:Project Summary Detailsposted by Carrie Laurendine on
Im sure this is addressed somewhere but my apologies I haven't found this info. When summarizing building square footage for PIf2, do outdoor balconies (of upper floors) need to be included?
Submetering dashboard
CI-2009 EAc3:Measurement and Verificationposted by Leticia SooHoo on
Hello, we are doing a LEED CI project for a large tenant occupying multiple floors. We will pursue Case 1 (less than 75% of area) - submetering.