LEED Site Boundary - Campus - easement for utilities

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michele Helou  on 

'The LEED project boundary must include .......all land that was or will be disturbed for the purpose of undertaking the LEED project.' What if a small section an adjacent campus parking lot that

0
1
Mon Nov 3, 2014, 1:12 pm

BTU Metering for Existing HVAC

CI-2009 EAc3:Measurement and Verification
posted by  Jareb Ketay  on 

I have a tenant renovation project occupying 1 story of an existing 10 story building (

1
Tue Sep 23, 2014, 7:13 pm

Who Can Be the Commissioning Authority

NC-2009 EAc3:Enhanced Commissioning
posted by  Robin Dukelow  on 

Hello, I am trying to locate the full document but only have been able to find the Table that was published. Does anyone know where I can find this information? - Thank you!

1
Tue Sep 23, 2014, 9:23 pm

Alternative path - maximum achievable points

NC-2009 WEc3:Water Use Reduction
posted by  Gloria Duci  on 

Hello everyone! In order to reduce use of potable water, WCs will be served by rainwater collected on-site.

0

LEED v4 Quick Reference - faults

General forums
posted by  Maria Glädt  on 

If you read the Quick Reference under Getting Started in the LEED v4 there are some mistakes both regarding available points under credits and also which prereq that is required or n/a.

1
Thu Oct 2, 2014, 5:05 pm

Baseline Ventilation

CS-2009 EAp2:Minimum Energy Performance
posted by  Toni Herena Montull  on 

Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.

1
Wed Sep 24, 2014, 6:43 pm

Interconnecting Staircase

Pilot-Credits EQpc78:Design for active occupants
posted by  Michelle DiPenti  on 

I have a question about optional requirement #3, "Provide accessibility to at least one open or interconnecting staircase to at least 50% of the tenant/occupant floors for convenient pedestrian ver

0

Expansion joints-LEED for schools v2009

Schools-2009 IEQc9:Enhanced Acoustical Performance
posted by  Stephanie Santiago  on 

For the expansion joints being used in a LEED project for schools v2009, do they have to meet the NRC requirement of 0.70? Currently our sub wants to use Seismic Colorseal, STC 52/OITC 38.

1
Wed Sep 24, 2014, 9:23 pm

Design System Primary supply Airflow (Vpsd)

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Charalampos Giannikopoulos  on 

For a VAV (multiple-zone) system should the Design System Primary supply Airflow (Vpsd) sum up the total supply (and not the outdoor) air of each zone?

0