energy used on-site vs sold energy

NC-v4 EAc5:Renewable energy production
posted by  LEEDme Lorenzi  on 

I’m reading the new version of the reference guide and I have some doubts concerning this credit. As example, within the LEED boundary electricity is produced by pv panels.

1
Thu Sep 11, 2014, 2:58 pm

gs 11 1993 test VS iso

Retail-CI-v2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Michele Comperti  on 

for a leed platinum project in Europe we must submit a wall paint wich has a certificate for voc content made under an iso 11890 test (product manufacturer is Akzo Nobel Italy factory, product Al

1
Thu May 19, 2016, 3:17 pm

Ecocert

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Gabriel Frasson  on 

Anyone knows if LEED accept Ecocert Seal?

1
Mon Jan 26, 2015, 1:07 am
1
Thu Sep 11, 2014, 5:06 pm

SS c2 Building Exterior Cleaning

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Hadrian Vivek  on 

We have procured certain eco-friendly products for the exterior cleaning of our facades and windows.

1
Wed Dec 10, 2014, 11:44 pm

5% path

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Andres Giraldo  on 

How can we set the form to achieve the 5% of the total site area as described in the reference guide. Because in LEED online, it's the 25% path set as default.

1
Tue Oct 28, 2014, 9:18 pm

retail spaces in office building

CS-2009 IEQc2:Increased Ventilation
posted by  Anna Bak  on 

Hi, In our C&S project the investor provides AHUs to supply fresh air to offices.

0

Data Center Calculator

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

For Data center project, I've supplied the designer team with the Data Center Calculator, so that they'd be able to fill it in with their project data. However, There are some questions in relation

0

Absorptive Materials

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Omar Elrawy  on 

Dear all, I actually do know what is an absorptive material but only by logic/sense.

1
Mon Sep 15, 2014, 5:43 pm

25 projects?

Forum for LEED Volume Program Certification
posted by  April Rice  on 

Do you have to have a minimum of 25 projects involved in your portfolio to utilize the Volume program?

1
Fri May 5, 2017, 3:41 pm